Architectural Works Contract Spain (Contrato de Obra de Arquitectura)
CONTRATO DE ENCARGO DE SERVICIOS DE ARQUITECTURA
Architectural Works Contract — Spain
Governed by Ley de Ordenación de la Edificación (LOE 38/1999) Article 10 and Código Civil Articles 1583–1600
1. PARTIES
CLIENT / PROMOTOR (CLIENTE / PROMOTOR):
Name: [Client Name]
NIF / CIF / DNI: [Client NIF]
Address: [Client Address]
Legal Representative: [Client Representative]
ARCHITECT / ARCHITECTURE FIRM (ARQUITECTO / ESTUDIO DE ARQUITECTURA):
Name: [Architect Name]
NIF / CIF: [Architect NIF]
Address: [Architect Address]
Colegio de Arquitectos Membership: [Colegio Membership]
Professional Indemnity Insurance: [Architect Insurance]
2. PROJECT DESCRIPTION
Project Address: [Project Address]
Cadastral Reference: [Cadastral Ref]
Description and Brief (Programa de Necesidades): [Project Description]
Estimated Construction Budget (PEM): [Estimated Budget]
Planning Constraints / Heritage Designations: [Planning Constraints]
3. SCOPE OF ARCHITECTURAL SERVICES
Services Included: [Services Included]
Expected Project Timeline and Milestones: [Project Timeline]
The architect's obligations are governed by Article 10 of the Ley de Ordenación de la Edificación (LOE 38/1999), which defines the proyectista as responsible for preparing the proyecto de edificación in accordance with the Código Técnico de la Edificación (CTE, RD 314/2006) Documentos Básicos — DB-SE (structural safety), DB-SI (fire safety), DB-SUA (safety of use and accessibility), DB-HS (hygiene and health), DB-HE (energy efficiency), and DB-HR (acoustic protection) — and the director de obra as responsible for the technical supervision of the construction.
The architect shall obtain the mandatory visado colegial from the competent Colegio de Arquitectos before submitting project documents to the Ayuntamiento for building permit application, under RD 1000/2010, de 5 de agosto, sobre visado colegial obligatorio. Visado fees charged by the Colegio are an additional cost paid by the client in addition to the architect's professional fees.
4. FEES AND PAYMENT
Fee Calculation Method: [Fee Type]
Total Agreed Fee: [Total Fee]
Payment Schedule: [Payment Schedule]
IVA at 21% (Ley 37/1992) is applicable to all architectural service fees. If the final PEM as established in the proyecto de ejecución differs materially (by more than 10%) from the estimated PEM stated above, the parties shall renegotiate the fee in good faith. Municipal building taxes (ICIO — Impuesto sobre Construcciones, Instalaciones y Obras, under RDL 2/2004 art. 100) are payable by the client directly to the Ayuntamiento and are not included in the architect's fees.
5. INTELLECTUAL PROPERTY AND LIABILITY
Intellectual Property: Under the Ley de Propiedad Intelectual (LPI, RDL 1/1996) Articles 5 and 10, the architect is the author (autor) of the architectural project. By executing this contract and upon full payment of the corresponding fee, the architect grants the client the derechos de explotación (reproduction, distribution, transformation, and communication rights) necessary to use, modify, and execute the project for its intended purpose. Any replication of the project design for multiple sites beyond the scope defined in this contract requires a separate licence agreement and additional fee.
Liability: The architect's liability for defects in building works is governed by LOE Article 17 — one year (finishing defects — vicios o defectos de ejecución), three years (habitability defects — deficiencias de habitabilidad), and ten years (structural defects — defectos estructurales). These liability periods commence from the fecha de recepción de la obra (practical completion). The architect's professional indemnity insurance described in Section 1 covers these liability periods.
6. REGULATORY COMPLIANCE
The architect undertakes to design in compliance with the CTE (RD 314/2006) Documentos Básicos and all other applicable building regulations in force at the time of project completion. The energy efficiency performance certificate (Certificado de Eficiencia Energética — CEE) prepared at design stage under RD 235/2013 shall meet the minimum energy performance requirements of CTE DB-HE.
The client, as promotor, is responsible for subscribing the seguro decenal (ten-year structural defects insurance) under LOE Article 19.1.c before registering the completed building at the Registro de la Propiedad, and shall cooperate with the Organismo de Control Técnico (OCT) appointed by the insurer throughout the design and construction process.
7. SUSPENSION AND TERMINATION
The client has the unilateral right to terminate this contract before completion under CC Article 1594 (desistimiento unilateral), subject to paying the architect for all work completed to the date of termination and compensating for the loss of expected profits (lucro cesante) on the remaining uncompleted services. Post-termination, the client retains the right to use the project documents produced and paid for, subject to the intellectual property provisions of Section 5.
The architect may suspend services for non-payment after a written demand and 15-day cure period, and may terminate for material breach (including persistent non-payment) under CC Article 1124. In the event of prolonged suspension due to permit delays or construction interruption beyond the architect's control, the parties shall agree a standby fee arrangement.
8. GOVERNING LAW AND JURISDICTION
This contract is governed by Spanish law, principally the Ley de Ordenación de la Edificación (LOE 38/1999), the Código Civil Articles 1583–1600 on arrendamiento de obra, the Código Técnico de la Edificación (CTE, RD 314/2006), and the applicable professional regulations of the Colegio de Arquitectos. Disputes shall be submitted to the Juzgados de Primera Instancia of [Contract City], waiving any other jurisdiction.
SIGNATURES
Signed in [Contract City], on [Contract Date].
CLIENT / PROMOTOR (CLIENTE / PROMOTOR):
[Client Name]
Represented by: [Client Representative]
Signature: _________________________ Date: _________________________
ARCHITECT / ARCHITECTURE FIRM (ARQUITECTO / ESTUDIO):
[Architect Name]
Colegio: [Colegio Membership]
Signature: _________________________ Date: _________________________
Client / Promotor
________________
Signature
Architect / Architecture Firm
________________
Signature
What Is a Architectural Works Contract Spain (Contrato de Obra de Arquitectura)?
An Architectural Works Contract Spain (Contrato de Encargo de Servicios de Arquitectura or Contrato de Obra de Arquitectura) is a formal written agreement between a client — the promotor or building owner (propietario) — and a licensed architect (arquitecto) or architecture firm (estudio de arquitectura), under which the architect undertakes to provide professional architectural services for a defined building or renovation project, including project design (diseño arquitectónico), preparation of technical project documentation (proyecto técnico), obtaining building permits (licencias de obras), and supervision of construction works (dirección de obra), governed principally by Article 10 of the Ley de Ordenación de la Edificación (LOE 38/1999) and Articles 1583 through 1600 of the Código Civil (CC) on the arrendamiento de obra (contract for a specific result).
The Ley de Ordenación de la Edificación (LOE 38/1999, de 5 de noviembre, de Ordenación de la Edificación) is the foundational statute governing the building construction process in Spain and defining the rights and obligations of each agente de la edificación (agent in the building process). Article 10 LOE defines the proyectista (designer) as the agent responsible for preparing the building project (proyecto de edificación) in accordance with the technical requirements of the Código Técnico de la Edificación (CTE, RD 314/2006), and the director de obra as the agent responsible for the technical supervision of the construction — verifying that the works conform to the approved project documents, the building permit conditions, and the CTE requirements. In Spanish law, both functions — proyectista and director de obra — may be performed by the same architect under a single architectural services contract, or by different architects under separate contracts.
The architect's professional qualification and Colegio de Arquitectos membership are mandatory preconditions for legally practising architecture in Spain. Under the Ley de Ordenación de la Edificación Article 12, the proyectista must hold a university degree in Architecture (título de Arquitecto) recognised under the European Qualifications Directive (Directiva 2005/36/CE) and must be a member of the Colegio de Arquitectos of the autonomous community where the project is located (for example, the Colegio Oficial de Arquitectos de Madrid — COAM, the Colegio de Arquitectos de Cataluña — COAC, or equivalent). The Colegios de Arquitectos maintain professional directories and issue the visado colegial (professional endorsement) for project documents — a mandatory step before most Ayuntamientos will process building permit applications.
The Código Civil Articles 1583 through 1600 govern the arrendamiento de obra — the contract for the provision of a specific result (obra) in exchange for a price (precio). For architectural services, the primary obligation is an obligation de resultat (obligación de resultado) in the design phase — the architect must deliver a technically compliant project that satisfies the client's brief and the applicable regulatory requirements — and an obligation of means (obligación de medios) in the construction supervision phase, where the architect must apply professional diligence to supervise the works but cannot guarantee the contractor's performance. CC Articles 1591 and 1600 establish the contractor's and architect's liability for defects in the constructed works, and this liability has been superseded for building works by the more detailed LOE framework.
The LOE Article 17 establishes the graduated liability periods for defects (vicios) in building works: one year (defectos de terminación o acabado — finishing defects), three years (defectos de habitabilidad — habitability defects), and ten years (defectos estructurales — structural or load-bearing defects), applicable to all agentes de la edificación including the proyectista and director de obra. The architect must maintain a seguro de responsabilidad civil profesional (professional indemnity insurance — PII) and, for new residential construction projects above thresholds established by the autonomous community, a seguro decenal (ten-year structural defects insurance) may need to be in place before the Notario registers the escritura de obra nueva declarada (new building deed). Under Ley 38/1999 as amended, professional architects' fee arrangements are freely negotiated — the minimum fee scales (baremos) historically published by the Colegios de Arquitectos were declared contrary to competition law and are no longer binding, though the Colegios publish indicative guides as reference.
When Do You Need a Architectural Works Contract Spain (Contrato de Obra de Arquitectura)?
An Architectural Works Contract Spain is required whenever a property developer, building owner, or individual homeowner engages a licensed architect to provide professional architectural services for a construction, renovation, or rehabilitation project in Spain that requires the preparation of a proyecto técnico and the issuance of a licencia de obras by the Ayuntamiento.
A Contrato de Obra de Arquitectura is needed when a promotor (property developer) commissions the design and technical project documentation for a new residential building, office complex, industrial facility, hotel, or retail development — the architecture contract formalises the architect's scope of services from initial design brief through detailed project documents and building permit application.
The contract is required when a homeowner wishes to carry out major renovation works (rehabilitación) to an existing dwelling — structural changes, facade alterations, roof replacement, or horizontal division modifications — that require a full proyecto técnico under the applicable municipal building regulations (ordenanzas municipales) and the CTE Documentos Básicos.
An Architectural Works Contract is needed when a comunidad de propietarios (owners' community) governed by the Ley de Propiedad Horizontal (LPH 49/1960) commissions an architect to prepare an energy efficiency rehabilitation project (proyecto de rehabilitación energética) under the Programa de Rehabilitación Energética de Edificios (PREE) or the Plan de Recuperación, Transformación y Resiliencia (PRTR) subsidy programmes — which require a signed architecture contract as part of the grant application documentation submitted to the Instituto para la Diversificación y Ahorro de la Energía (IDAE) or the autonomous community energy agency.
The contract is required when a business commissions the design of a commercial premises fit-out (acondicionamiento de local commercial) — change of use (cambio de uso), interior layout changes (distribución interior), accessibility improvements under Real Decreto Legislativo 1/2013 (Ley General de derechos de las personas con discapacidad), or installation of new signage and facades subject to urban planning and heritage protection regulations.
An Architectural Works Contract is needed when a developer seeks to obtain a certificado de habitabilidad (habitability certificate) or licencia de primera ocupación (first occupation licence) from the Ayuntamiento for a completed building — the architecture contract documents the director de obra's continuing responsibility through the certificate of completion (certificado final de obra) and the preparation of the documentation for the Libro del Edificio.
The contract is also required for heritage or listed building works (obras en edificios catalogados or bienes de interés cultural — BIC) subject to authorisation by the Consejería de Cultura of the competent autonomous community under Ley 16/1985 del Patrimonio Histórico Español, which imposes specific design constraints, approval processes, and documentation requirements — often requiring the architect to submit detailed heritage impact assessments alongside the standard proyecto técnico.
What to Include in Your Architectural Works Contract Spain (Contrato de Obra de Arquitectura)
A valid Architectural Works Contract Spain under LOE 38/1999 Article 10 and CC Articles 1583–1600 must contain the following essential elements to be enforceable and to meet professional and regulatory requirements.
Identification of Parties: Full legal name, DNI/NIE/NIF, and address of the client (promotor or propietario) and the architect (arquitecto) or architecture firm (estudio de arquitectura). The architect's Colegio de Arquitectos membership number, the Colegio to which they belong (COAM, COAC, COAV, or equivalent), and the validity of their professional indemnity insurance (seguro de responsabilidad civil profesional) must be confirmed. For architecture firms, the Registro Mercantil details and the name of the architect responsible for the project (arquitecto responsable del proyecto) must be stated.
Project Description: A detailed description of the project — the property address (with cadastral reference — referencia catastral — and Registro de la Propiedad registration details), the proposed use (residential, commercial, industrial, mixed-use), the approximate total build surface area (m² construidos), the number of floors and units, and the general design objectives and brief (programa de necesidades). Any existing planning permissions, heritage protection designations, or constraints applicable to the property must be identified.
Scope of Architectural Services: A precise description of the services to be provided, distinguishing between: avance de proyecto (conceptual design); anteproyecto (preliminary design); proyecto básico (basic project — sufficient for building permit application in most autonomous communities); proyecto de ejecución (execution project — full technical details for construction); dirección de obra (construction direction — site supervision); coordinación de seguridad y salud (safety and health coordination under RD 1627/1997, if applicable); and tramitación administrativa (administrative processing — building permit applications, visado colegial, first occupation licence applications).
Fee Structure and Payment: The architect's fees (honorarios de arquitecto), whether calculated as a percentage of the estimated construction budget (presupuesto estimado de ejecución material — PEM), as a lump sum (precio alzado), or as an hourly rate (precio por horas) for specific advisory services. The payment schedule tied to project milestones — percentage at commission signing, percentage at anteproyecto delivery, percentage at visado colegial, percentage at building permit grant, and balance upon certificado final de obra. IVA at 21% is applicable to architectural services under Ley 37/1992.
Visado Colegial: The architect's obligation to obtain the mandatory visado (professional endorsement) from the competent Colegio de Arquitectos before submitting project documents to the Ayuntamiento for building permit application. The visado fee charged by the Colegio is an additional cost paid by the client in addition to the architect's fees. The client authorises the architect to submit documents to the Colegio on the client's behalf.
Building Permit and Administrative Processing: The architect's obligations in the permit application process — preparation of all technical documentation required by the Ayuntamiento and the autonomous community planning legislation, coordination with municipal technical services, and response to technical queries (requerimientos técnicos) — and the allocation of risk for permit delays or refusals beyond the architect's control. The client must pay municipal taxes (ICIO — Impuesto sobre Construcciones, Instalaciones y Obras, under Ley Reguladora de Haciendas Locales RDL 2/2004 Article 100) and Ayuntamiento administrative fees separately.
Código Técnico de la Edificación (CTE) Compliance: The architect's obligation to design in conformity with the CTE (RD 314/2006) Documentos Básicos — DB-SE (structural safety), DB-SI (fire safety), DB-SUA (safety of use and accessibility), DB-HS (hygiene, health, and environmental protection), DB-HE (energy efficiency), and DB-HR (acoustic protection) — and to certify CTE compliance in the project documentation. The energy efficiency certificate (Certificado de Eficiencia Energética) prepared at design stage under RD 235/2013 must meet the minimum energy performance requirements of DB-HE.
Liability and Insurance: The architect's liability for design defects under LOE Article 17 — one year (finishing defects), three years (habitability defects), ten years (structural defects) — and the professional indemnity insurance (seguro de responsabilidad civil profesional) covering these liability periods. The client should verify that the architect's PII is current and provides adequate coverage for the estimated project value. For new residential construction above thresholds, a seguro decenal requirement applicable to the promotor should also be addressed in the overall project insurance strategy.
Intellectual Property: Under Ley de Propiedad Intelectual (LPI, RDL 1/1996) Articles 5 and 10, the architect is the author (autor) of the architectural project — an obra del espíritu protegida by copyright (derechos de autor). The contract must address the assignment of economic rights (derechos de explotación) necessary for the project to be used, modified, and executed — including the right to reproduce (derecho de reproducción), transform (derecho de transformación), and distribute (derecho de distribución) the project documents. The client's right to use the project for its intended purpose is granted by the contract; any use of the project beyond the original intended scope (for example, replication of the design for multiple identical buildings) requires a separate licence or additional fee. Forms-legal.com provides this Architectural Works Contract Spain as a professional starting document; all architectural projects should include a contract reviewed by the architect and, for significant projects, by a qualified abogado especialista en derecho de la construcción.
Duration and Termination: The expected project timeline with key milestones and target dates (anteproyecto delivery, proyecto de ejecución delivery, building permit submission and expected grant, construction start and completion). Provisions for suspension or termination — the client's right to terminate under CC Article 1594 (upon payment of the architect's work completed and loss of expected profit), and the architect's right to terminate for non-payment. Any suspension of services during prolonged permit delays or construction interruptions and the applicable standby fee must be addressed.
Under the Ley de Sociedades de Capital (LSC) RDL 1/2010, the Registro Mercantil maintains the register of Spanish companies. The Código de Comercio 1885 governs commercial obligations. The Agencia Estatal de Administración Tributaria (AEAT) administers Impuesto sobre Sociedades (IS) under Ley 27/2014. The Comisión Nacional de los Mercados y la Competencia (CNMC) enforces competition law. The Código Civil governs general contractual obligations under Article 1255.
Cite this page
Reference this free template in an article, syllabus, or research note:
Forms Legal. (2026). Architectural Works Contract Spain (Contrato de Obra de Arquitectura) (Spain) [Legal document template]. Forms Legal. https://forms-legal.com/espana/business/construction/architectural-works-contract-spain
"Architectural Works Contract Spain (Contrato de Obra de Arquitectura) (Spain)." Forms Legal, 2026, https://forms-legal.com/espana/business/construction/architectural-works-contract-spain.
@misc{formslegal-architectural-works-contract-spain,
author = {{Forms Legal}},
title = {Architectural Works Contract Spain (Contrato de Obra de Arquitectura) (Spain)},
year = {2026},
howpublished = {\url{https://forms-legal.com/espana/business/construction/architectural-works-contract-spain}},
note = {Free legal document template}
}Frequently Asked Questions
En el marco normativo de la edificación español, el proyecto básico y el proyecto de ejecución son dos niveles distintos de documentación técnica requeridos en diferentes fases del proceso de obtención de licencias de obras. El proyecto básico contiene la información suficiente para definir las características generales del edificio —ubicación, uso, superficies, altura, número de unidades, concepto del sistema estructural y justificación básica del cumplimiento del CTE— para que el Ayuntamiento pueda evaluar el proyecto frente a las normativas urbanísticas (PGOU) y conceder la licencia urbanística o la licencia de obras mayor. El proyecto básico habitualmente no incluye los detalles constructivos suficientes para que el contratista pueda ejecutar la obra. El proyecto de ejecución completa el proyecto básico con los detalles técnicos completos necesarios para la construcción: cálculos y planos estructurales detallados, diseño completo de las instalaciones (electricidad, fontanería, climatización, protección contra incendios), especificaciones de materiales, secciones y detalles constructivos, y la documentación completa de cumplimiento del CTE. El proyecto de ejecución debe estar completado y aprobado por el director de obra antes del inicio de las obras. Algunos Ayuntamientos exigen el proyecto de ejecución completo —no solo el básico— para la solicitud de licencia de obras: este requisito varía según la comunidad autónoma y el municipio.
El visado colegial es el proceso de refrendo profesional que lleva a cabo el Colegio de Arquitectos (o el Colegio Oficial de Aparejadores y Arquitectos Técnicos — COAAT, para aparejadores) antes de que los documentos técnicos del proyecto puedan presentarse ante las autoridades públicas para la obtención de licencias de obras u otras autorizaciones. Conforme al RD 1000/2010, de 5 de agosto, sobre visado colegial obligatorio, el visado es preceptivo para una lista específica de documentos —incluidos el proyecto básico y el proyecto de ejecución para nuevas construcciones y rehabilitaciones mayores sujetas a licencia de obras mayor, y el certificado final de obra firmado por el director de obra—. El proceso de visado verifica que el arquitecto que suscribe los documentos dispone de una colegiación válida, está cualificado profesionalmente para acometer el tipo de proyecto en cuestión y que los documentos cumplen los requisitos formales mínimos establecidos por el Colegio. El visado no garantiza la corrección técnica ni el cumplimiento del CTE del proyecto: es una verificación de identidad profesional y de colegiación, no una revisión técnica. El Colegio cobra unas tasas de visado calculadas como porcentaje del coste estimado del proyecto o de los honorarios estimados del arquitecto; estas tasas son abonadas por el cliente y son independientes de los honorarios profesionales del arquitecto.
La responsabilidad del arquitecto por vicios en las obras de edificación en España está regulada por el artículo 17 de la Ley de Ordenación de la Edificación (LOE 38/1999), que establece plazos de responsabilidad personal graduados en función del tipo de vicio. El proyectista es personalmente responsable de los vicios en los documentos del proyecto de edificación —errores de diseño que provoquen deficiencias de habitabilidad o fallos estructurales— durante el plazo de responsabilidad aplicable: un año para los vicios o defectos en los elementos de terminación o acabado; tres años para los vicios que afecten a la habitabilidad (deficiencias en los elementos constructivos o en las instalaciones que ocasionen el incumplimiento de los requisitos de habitabilidad); y diez años para los vicios o defectos en los elementos estructurales. Los mismos plazos graduados se aplican al director de obra. Los plazos de responsabilidad comienzan a contar desde la fecha de recepción de la obra conforme al artículo 6 LOE. Los plazos de prescripción para ejercitar acciones contra el arquitecto corren desde la fecha de manifestación del vicio, con sujeción a los plazos máximos de responsabilidad de la LOE. El seguro de responsabilidad civil profesional del arquitecto debe cubrir los tres plazos de responsabilidad.
El ICIO (Impuesto sobre Construcciones, Instalaciones y Obras) regulado en los artículos 100 a 103 de la Ley Reguladora de las Haciendas Locales (RDL 2/2004) es un impuesto municipal que recae sobre el coste de las construcciones, instalaciones u obras que requieran licencia de obras del Ayuntamiento. El sujeto pasivo del ICIO es el propietario del inmueble —el promotor o propietario que es el cliente en el contrato de obra de arquitectura y el titular de la licencia de obras—. El tipo del ICIO es fijado por cada Ayuntamiento con un máximo del 4% del presupuesto de ejecución material (PEM) declarado en la solicitud de licencia de obras. El pago del ICIO es un requisito previo para que el Ayuntamiento conceda la licencia de obras. El papel del arquitecto es elaborar el presupuesto de ejecución material como parte del proyecto técnico: la exactitud de este presupuesto incide directamente en el importe del ICIO a pagar. Tras la finalización de la obra, el Ayuntamiento puede revisar el ICIO en función de los costes reales de construcción si estos superan significativamente el importe autorizado. El ICIO se liquida con independencia de los honorarios del arquitecto y constituye una obligación directa del cliente ante el Ayuntamiento.
Sí. El artículo 1594 del Código Civil reconoce al cliente (dueño de la obra) el derecho unilateral de desistir de un contrato de obra en cualquier momento antes de su terminación, abonando al contratista —en este caso, al arquitecto— el trabajo ya realizado, los materiales empleados y la indemnización por la pérdida del beneficio esperado (lucro cesante). Este derecho estatutario de desistimiento unilateral conforme al artículo 1594 CC no puede excluirse contractualmente, aunque las partes pueden acordar penalizaciones por resolución anticipada o plazos de preaviso específicos. En el contexto del contrato de arquitectura, el derecho de resolución del cliente conforme al artículo 1594 implica que, por ejemplo, el cliente puede decidir no continuar con el proyecto tras recibir el anteproyecto, pero debe abonar al arquitecto el trabajo del anteproyecto e indemnizarle por la pérdida de los honorarios que hubiera percibido de haber continuado el proyecto hasta su conclusión. El arquitecto también tiene derecho a resolver el contrato por incumplimiento grave del cliente —habitualmente, el impago de honorarios— después de formular un requerimiento formal de pago y conceder un plazo razonable de subsanación. Tras la resolución, las cláusulas de propiedad intelectual del contrato determinan si el cliente puede conservar y utilizar los documentos del proyecto por los que se han abonado los honorarios.
El seguro decenal es un seguro de daños obligatorio exigido por el artículo 19.1.c) de la Ley de Ordenación de la Edificación (LOE 38/1999) para los edificios destinados principalmente a uso residencial (uso predominantemente vivienda) en España. El seguro decenal debe estar contratado antes de que el promotor pueda inscribir el nuevo edificio en el Registro de la Propiedad mediante la escritura de obra nueva terminada: sin el seguro, el Notario habitualmente se negará a autorizar la escritura y el Registrador de la Propiedad rechazará la inscripción. La póliza cubre los defectos estructurales (en cimentación, estructura portante y cubiertas) durante diez años desde la fecha de recepción de la obra y es suscrita por el promotor en beneficio de todos los futuros propietarios del edificio. La aseguradora designa un Organismo de Control Técnico (OCT) para revisar el proyecto durante el diseño y la construcción, y esta revisión es un requisito previo para la emisión de la póliza. El coste del seguro decenal —habitualmente entre el 0,5% y el 1,5% del presupuesto de construcción— es asumido por el promotor y se refleja indirectamente en el precio de venta de las unidades. El arquitecto director de obra debe cooperar con el OCT durante todo el proceso constructivo.
Los nuevos edificios en España deben cumplir los requisitos de eficiencia energética establecidos en el Documento Básico HE (Ahorro de Energía) del Código Técnico de la Edificación (CTE), actualizado por el RD 732/2019 y posteriormente por el Ministerio de Transportes. El CTE DB-HE establece exigencias mínimas de comportamiento energético para: la envolvente térmica (HE1 — límites de transmitancia térmica de la envolvente del edificio —valores U para muros, cubiertas y acristalamientos— y requisitos de permeabilidad al aire); las instalaciones de energía renovable (HE5 — requisitos mínimos de generación de energía solar fotovoltaica para edificios que superen los umbrales definidos); la energía solar térmica para el agua caliente sanitaria (HE4 — sustituido por requisitos más amplios de energías renovables en la actualización de 2019); y la demanda energética global (HE0 — límites de consumo de energía primaria expresados en kWhEP/(m²·año) por zona climática y tipo de edificio). El arquitecto debe acreditar el cumplimiento del CTE DB-HE en el proyecto de ejecución utilizando las herramientas de cálculo energético reconocidas —HULC (Herramienta Unificada LIDER-CALENER) publicada por el IDAE y el Ministerio de Transportes— y debe presentar el Certificado de Eficiencia Energética del edificio terminado conforme al RD 235/2013 para obtener la licencia de primera ocupación. La refundición de la Directiva europea sobre eficiencia energética de los edificios (EPBD Recast — Directiva 2024/1275/UE) introduce progresivamente los requisitos de edificios de consumo de energía casi nulo (EECN/NZEB) con carácter vinculante para los nuevos edificios a partir de 2027.
This template is provided for informational purposes only and does not constitute legal advice. Laws vary by jurisdiction and change over time. Consult a qualified attorney for advice specific to your situation.Full disclaimer
Found an error? Let us knowRelated Documents
You may also find these documents useful:
Contrato de Instalaciones — Obras de Instalación
Contrato de Instalaciones para España — regulado por la Ley de Ordenación de la Edificación (LOE 38/1999) artículo 11, que regula las obligaciones de los instaladores en obras de construcción, con cumplimiento del Reglamento Electrotécnico de Baja Tensión (RD 842/2002) y los códigos técnicos aplicables.
Contrato de Obra España
Contrato de Obra para España — regulado por la Ley de Ordenación de la Edificación (LOE 38/1999) artículo 11, el Código Civil artículos 1588-1600 y el Código Técnico de la Edificación (CTE), que define las obligaciones del contratista, el promotor y la dirección facultativa.
Contrato de Mantenimiento España — CC art. 1544 y RITE
Contrato de Mantenimiento para España conforme al artículo 1544 del Código Civil (arrendamiento de servicios), que regula el mantenimiento preventivo y correctivo de maquinaria, equipos, instalaciones o edificios para clientes comerciales e industriales, con tiempos de respuesta y estándares técnicos pactados.
Acuerdo de Prestación de Servicios España
Acuerdo de Prestación de Servicios para España — conforme al artículo 1544 del Código Civil (arrendamiento de servicios), regulando el alcance, honorarios y condiciones de los servicios profesionales o comerciales prestados entre dos partes sin crear relación laboral conforme al Estatuto de los Trabajadores.