Architectural Works Contract Spain (Contrato de Obra de Arquitectura)

Key facts

SpainSpainEnglish (ES)FreePDF & WordUpdated Jun 6, 2026
Legal basisSpainNotarization: Not requiredWitnesses: 0Parties: 2
Architectural Works Contract (Contrato de Obra de Arquitectura)
Architectural Works Contract Spain (Contrato de Obra de Arquitectura)

CONTRATO DE ENCARGO DE SERVICIOS DE ARQUITECTURA

Contrato de Obra de Arquitectura — España

Regulado por la Ley de Ordenación de la Edificación (LOE 38/1999) artículo 10 y el Código Civil artículos 1583–1600

1. PARTES

CLIENTE / PROMOTOR:

NIF / CIF / DNI: [Client NIF]

Domicilio: [Client Address]

Representante legal: [Client Representative]

ARQUITECTO / ESTUDIO DE ARQUITECTURA:

NIF / CIF: [Architect NIF]

Colegiación en el Colegio de Arquitectos: [Colegio Membership]

Seguro de Responsabilidad Civil Profesional: [Architect Insurance]

2. DESCRIPCIÓN DEL PROYECTO

Dirección del Inmueble: [Project Address]

Referencia Catastral: [Cadastral Ref]

Descripción y Programa de Necesidades: [Project Description]

Presupuesto de Ejecución Material (PEM) Estimado: [Estimated Budget]

Condicionantes Urbanísticos / Protecciones Patrimoniales: [Planning Constraints]

3. ALCANCE DE LOS SERVICIOS DE ARQUITECTURA

Servicios Incluidos: [Services Included]

Cronograma Previsto y Hitos del Proyecto: [Project Timeline]

Las obligaciones del arquitecto se rigen por el artículo 10 de la Ley de Ordenación de la Edificación (LOE 38/1999), que define al proyectista como responsable de redactar el proyecto de edificación conforme al Código Técnico de la Edificación (CTE, RD 314/2006) y sus Documentos Básicos — DB-SE (seguridad estructural), DB-SI (seguridad en caso de incendio), DB-SUA (seguridad de utilización y accesibilidad), DB-HS (salubridad), DB-HE (ahorro de energía) y DB-HR (protección frente al ruido) — y al director de obra como responsable de la supervisión técnica de la ejecución.

El arquitecto deberá obtener el visado colegial obligatorio del Colegio de Arquitectos competente antes de presentar la documentación del proyecto ante el Ayuntamiento para la solicitud de licencia de obras, conforme al RD 1000/2010, de 5 de agosto, sobre visado colegial obligatorio. Las tasas de visado cobradas por el Colegio constituyen un coste adicional a cargo del cliente, distinto de los honorarios profesionales del arquitecto.

4. HONORARIOS Y PAGO

Método de Cálculo de Honorarios: [Fee Type]

Honorarios Totales Acordados: [Total Fee]

Calendario de Pagos: [Payment Schedule]

El IVA al 21% (Ley 37/1992) es aplicable a todos los honorarios por servicios de arquitectura. Si el PEM final establecido en el proyecto de ejecución difiere de forma sustancial (en más de un 10%) del PEM estimado indicado anteriormente, las partes renegociarán los honorarios de buena fe. Los tributos municipales sobre la construcción (ICIO — Impuesto sobre Construcciones, Instalaciones y Obras, conforme al RDL 2/2004 art. 100) corren a cargo del cliente, quien los abonará directamente al Ayuntamiento, y no están incluidos en los honorarios del arquitecto.

5. PROPIEDAD INTELECTUAL Y RESPONSABILIDAD

Propiedad Intelectual: Conforme a los artículos 5 y 10 de la Ley de Propiedad Intelectual (LPI, RDL 1/1996), el arquitecto es el autor del proyecto arquitectónico. Mediante la firma de este contrato y previo pago íntegro de los honorarios correspondientes, el arquitecto cede al cliente los derechos de explotación (reproducción, distribución, transformación y comunicación pública) necesarios para usar, modificar y ejecutar el proyecto conforme a su finalidad prevista. Cualquier reproducción del diseño del proyecto para otros emplazamientos, más allá del alcance definido en este contrato, requerirá un acuerdo de licencia independiente y honorarios adicionales.

Responsabilidad: La responsabilidad del arquitecto por defectos en la obra se rige por el artículo 17 de la LOE — un año (vicios o defectos de ejecución), tres años (deficiencias de habitabilidad) y diez años (defectos estructurales). Estos plazos de responsabilidad se computan desde la fecha de recepción de la obra. El seguro de responsabilidad civil profesional del arquitecto descrito en el apartado 1 cubre estos plazos de responsabilidad.

6. CUMPLIMIENTO NORMATIVO

El arquitecto se compromete a diseñar el proyecto conforme a los Documentos Básicos del CTE (RD 314/2006) y a cualquier otra normativa de edificación aplicable vigente en el momento de finalización del proyecto. El Certificado de Eficiencia Energética (CEE) elaborado en fase de diseño conforme al RD 235/2013 deberá cumplir los requisitos mínimos de eficiencia energética del DB-HE del CTE.

El cliente, en su condición de promotor, es responsable de suscribir el seguro decenal (seguro de daños materiales por defectos estructurales a diez años) conforme al artículo 19.1.c de la LOE antes de inscribir el edificio terminado en el Registro de la Propiedad, y deberá colaborar con el Organismo de Control Técnico (OCT) designado por la aseguradora durante todo el proceso de diseño y construcción.

7. SUSPENSIÓN Y RESOLUCIÓN

El cliente tiene derecho a desistir unilateralmente de este contrato antes de su finalización conforme al artículo 1594 del Código Civil (desistimiento unilateral), quedando obligado a abonar al arquitecto la totalidad del trabajo realizado hasta la fecha de resolución y a compensarle por el lucro cesante correspondiente a los servicios pendientes de ejecución. Tras la resolución, el cliente conserva el derecho de uso de los documentos del proyecto elaborados y abonados, sujeto a las disposiciones sobre propiedad intelectual del apartado 5.

El arquitecto podrá suspender los servicios por impago tras un requerimiento escrito y un plazo de subsanación de 15 días, y podrá resolver el contrato por incumplimiento esencial (incluido el impago persistente) conforme al artículo 1124 del Código Civil. En caso de suspensión prolongada por retrasos en la licencia o interrupción de la obra ajena al control del arquitecto, las partes acordarán una compensación por disponibilidad (standby).

8. LEY APLICABLE Y JURISDICCIÓN

Este contrato se rige por la legislación española, principalmente la Ley de Ordenación de la Edificación (LOE 38/1999), el Código Civil artículos 1583–1600 sobre el arrendamiento de obra, el Código Técnico de la Edificación (CTE, RD 314/2006) y la normativa profesional aplicable del Colegio de Arquitectos. Las controversias se someterán a los Juzgados de Primera Instancia de [Contract City], con renuncia expresa a cualquier otro fuero.

FIRMAS

CLIENTE / PROMOTOR:

Representado por: [Client Representative]

Firma: _________________________ Fecha: _________________________

ARQUITECTO / ESTUDIO DE ARQUITECTURA:

Firma: _________________________ Fecha: _________________________

Cliente / Promotor

________________

Signature

Arquitecto / Estudio de Arquitectura

________________

Signature

Maintained by Vladislav Sergienko, Founder·Template last modified: ·Report an error

What Is a Architectural Works Contract Spain (Contrato de Obra de Arquitectura)?

An Architectural Works Contract Spain (Contrato de Encargo de Servicios de Arquitectura or Contrato de Obra de Arquitectura) is a formal written agreement between a client — the promotor or building owner (propietario) — and a licensed architect (arquitecto) or architecture firm (estudio de arquitectura), under which the architect undertakes to provide professional architectural services for a defined building or renovation project, including project design (diseño arquitectónico), preparation of technical project documentation (proyecto técnico), obtaining building permits (licencias de obras), and supervision of construction works (dirección de obra), governed principally by Article 10 of the Ley de Ordenación de la Edificación (LOE 38/1999) and Articles 1583 through 1600 of the Código Civil (CC) on the arrendamiento de obra (contract for a specific result).

The Ley de Ordenación de la Edificación (LOE 38/1999, de 5 de noviembre, de Ordenación de la Edificación) is the foundational statute governing the building construction process in Spain and defining the rights and obligations of each agente de la edificación (agent in the building process). Article 10 LOE defines the proyectista (designer) as the agent responsible for preparing the building project (proyecto de edificación) in accordance with the technical requirements of the Código Técnico de la Edificación (CTE, RD 314/2006), and the director de obra as the agent responsible for the technical supervision of the construction — verifying that the works conform to the approved project documents, the building permit conditions, and the CTE requirements. In Spanish law, both functions — proyectista and director de obra — may be performed by the same architect under a single architectural services contract, or by different architects under separate contracts.

The architect's professional qualification and Colegio de Arquitectos membership are mandatory preconditions for legally practising architecture in Spain. Under the Ley de Ordenación de la Edificación Article 12, the proyectista must hold a university degree in Architecture (título de Arquitecto) recognised under the European Qualifications Directive (Directiva 2005/36/CE) and must be a member of the Colegio de Arquitectos of the autonomous community where the project is located (for example, the Colegio Oficial de Arquitectos de Madrid — COAM, the Colegio de Arquitectos de Cataluña — COAC, or equivalent). The Colegios de Arquitectos maintain professional directories and issue the visado colegial (professional endorsement) for project documents — a mandatory step before most Ayuntamientos will process building permit applications.

The Código Civil Articles 1583 through 1600 govern the arrendamiento de obra — the contract for the provision of a specific result (obra) in exchange for a price (precio). For architectural services, the primary obligation is an obligation de resultat (obligación de resultado) in the design phase — the architect must deliver a technically compliant project that satisfies the client's brief and the applicable regulatory requirements — and an obligation of means (obligación de medios) in the construction supervision phase, where the architect must apply professional diligence to supervise the works but cannot guarantee the contractor's performance. CC Articles 1591 and 1600 establish the contractor's and architect's liability for defects in the constructed works, and this liability has been superseded for building works by the more detailed LOE framework.

The LOE Article 17 establishes the graduated liability periods for defects (vicios) in building works: one year (defectos de terminación o acabado — finishing defects), three years (defectos de habitabilidad — habitability defects), and ten years (defectos estructurales — structural or load-bearing defects), applicable to all agentes de la edificación including the proyectista and director de obra. The architect must maintain a seguro de responsabilidad civil profesional (professional indemnity insurance — PII) and, for new residential construction projects above thresholds established by the autonomous community, a seguro decenal (ten-year structural defects insurance) may need to be in place before the Notario registers the escritura de obra nueva declarada (new building deed). Under Ley 38/1999 as amended, professional architects' fee arrangements are freely negotiated — the minimum fee scales (baremos) historically published by the Colegios de Arquitectos were declared contrary to competition law and are no longer binding, though the Colegios publish indicative guides as reference.

When Do You Need a Architectural Works Contract Spain (Contrato de Obra de Arquitectura)?

An Architectural Works Contract Spain is required whenever a property developer, building owner, or individual homeowner engages a licensed architect to provide professional architectural services for a construction, renovation, or rehabilitation project in Spain that requires the preparation of a proyecto técnico and the issuance of a licencia de obras by the Ayuntamiento.

A Contrato de Obra de Arquitectura is needed when a promotor (property developer) commissions the design and technical project documentation for a new residential building, office complex, industrial facility, hotel, or retail development — the architecture contract formalises the architect's scope of services from initial design brief through detailed project documents and building permit application.

The contract is required when a homeowner wishes to carry out major renovation works (rehabilitación) to an existing dwelling — structural changes, facade alterations, roof replacement, or horizontal division modifications — that require a full proyecto técnico under the applicable municipal building regulations (ordenanzas municipales) and the CTE Documentos Básicos.

An Architectural Works Contract is needed when a comunidad de propietarios (owners' community) governed by the Ley de Propiedad Horizontal (LPH 49/1960) commissions an architect to prepare an energy efficiency rehabilitation project (proyecto de rehabilitación energética) under the Programa de Rehabilitación Energética de Edificios (PREE) or the Plan de Recuperación, Transformación y Resiliencia (PRTR) subsidy programmes — which require a signed architecture contract as part of the grant application documentation submitted to the Instituto para la Diversificación y Ahorro de la Energía (IDAE) or the autonomous community energy agency.

The contract is required when a business commissions the design of a commercial premises fit-out (acondicionamiento de local commercial) — change of use (cambio de uso), interior layout changes (distribución interior), accessibility improvements under Real Decreto Legislativo 1/2013 (Ley General de derechos de las personas con discapacidad), or installation of new signage and facades subject to urban planning and heritage protection regulations.

An Architectural Works Contract is needed when a developer seeks to obtain a certificado de habitabilidad (habitability certificate) or licencia de primera ocupación (first occupation licence) from the Ayuntamiento for a completed building — the architecture contract documents the director de obra's continuing responsibility through the certificate of completion (certificado final de obra) and the preparation of the documentation for the Libro del Edificio.

The contract is also required for heritage or listed building works (obras en edificios catalogados or bienes de interés cultural — BIC) subject to authorisation by the Consejería de Cultura of the competent autonomous community under Ley 16/1985 del Patrimonio Histórico Español, which imposes specific design constraints, approval processes, and documentation requirements — often requiring the architect to submit detailed heritage impact assessments alongside the standard proyecto técnico.

What to Include in Your Architectural Works Contract Spain (Contrato de Obra de Arquitectura)

A valid Architectural Works Contract Spain under LOE 38/1999 Article 10 and CC Articles 1583–1600 must contain the following essential elements to be enforceable and to meet professional and regulatory requirements.

Identification of Parties: Full legal name, DNI/NIE/NIF, and address of the client (promotor or propietario) and the architect (arquitecto) or architecture firm (estudio de arquitectura). The architect's Colegio de Arquitectos membership number, the Colegio to which they belong (COAM, COAC, COAV, or equivalent), and the validity of their professional indemnity insurance (seguro de responsabilidad civil profesional) must be confirmed. For architecture firms, the Registro Mercantil details and the name of the architect responsible for the project (arquitecto responsable del proyecto) must be stated.

Project Description: A detailed description of the project — the property address (with cadastral reference — referencia catastral — and Registro de la Propiedad registration details), the proposed use (residential, commercial, industrial, mixed-use), the approximate total build surface area (m² construidos), the number of floors and units, and the general design objectives and brief (programa de necesidades). Any existing planning permissions, heritage protection designations, or constraints applicable to the property must be identified.

Scope of Architectural Services: A precise description of the services to be provided, distinguishing between: avance de proyecto (conceptual design); anteproyecto (preliminary design); proyecto básico (basic project — sufficient for building permit application in most autonomous communities); proyecto de ejecución (execution project — full technical details for construction); dirección de obra (construction direction — site supervision); coordinación de seguridad y salud (safety and health coordination under RD 1627/1997, if applicable); and tramitación administrativa (administrative processing — building permit applications, visado colegial, first occupation licence applications).

Fee Structure and Payment: The architect's fees (honorarios de arquitecto), whether calculated as a percentage of the estimated construction budget (presupuesto estimado de ejecución material — PEM), as a lump sum (precio alzado), or as an hourly rate (precio por horas) for specific advisory services. The payment schedule tied to project milestones — percentage at commission signing, percentage at anteproyecto delivery, percentage at visado colegial, percentage at building permit grant, and balance upon certificado final de obra. IVA at 21% is applicable to architectural services under Ley 37/1992.

Visado Colegial: The architect's obligation to obtain the mandatory visado (professional endorsement) from the competent Colegio de Arquitectos before submitting project documents to the Ayuntamiento for building permit application. The visado fee charged by the Colegio is an additional cost paid by the client in addition to the architect's fees. The client authorises the architect to submit documents to the Colegio on the client's behalf.

Building Permit and Administrative Processing: The architect's obligations in the permit application process — preparation of all technical documentation required by the Ayuntamiento and the autonomous community planning legislation, coordination with municipal technical services, and response to technical queries (requerimientos técnicos) — and the allocation of risk for permit delays or refusals beyond the architect's control. The client must pay municipal taxes (ICIO — Impuesto sobre Construcciones, Instalaciones y Obras, under Ley Reguladora de Haciendas Locales RDL 2/2004 Article 100) and Ayuntamiento administrative fees separately.

Código Técnico de la Edificación (CTE) Compliance: The architect's obligation to design in conformity with the CTE (RD 314/2006) Documentos Básicos — DB-SE (structural safety), DB-SI (fire safety), DB-SUA (safety of use and accessibility), DB-HS (hygiene, health, and environmental protection), DB-HE (energy efficiency), and DB-HR (acoustic protection) — and to certify CTE compliance in the project documentation. The energy efficiency certificate (Certificado de Eficiencia Energética) prepared at design stage under RD 235/2013 must meet the minimum energy performance requirements of DB-HE.

Liability and Insurance: The architect's liability for design defects under LOE Article 17 — one year (finishing defects), three years (habitability defects), ten years (structural defects) — and the professional indemnity insurance (seguro de responsabilidad civil profesional) covering these liability periods. The client should verify that the architect's PII is current and provides adequate coverage for the estimated project value. For new residential construction above thresholds, a seguro decenal requirement applicable to the promotor should also be addressed in the overall project insurance strategy.

Intellectual Property: Under Ley de Propiedad Intelectual (LPI, RDL 1/1996) Articles 5 and 10, the architect is the author (autor) of the architectural project — an obra del espíritu protegida by copyright (derechos de autor). The contract must address the assignment of economic rights (derechos de explotación) necessary for the project to be used, modified, and executed — including the right to reproduce (derecho de reproducción), transform (derecho de transformación), and distribute (derecho de distribución) the project documents. The client's right to use the project for its intended purpose is granted by the contract; any use of the project beyond the original intended scope (for example, replication of the design for multiple identical buildings) requires a separate licence or additional fee. Forms-legal.com provides this Architectural Works Contract Spain as a professional starting document; all architectural projects should include a contract reviewed by the architect and, for significant projects, by a qualified abogado especialista en derecho de la construcción.

Duration and Termination: The expected project timeline with key milestones and target dates (anteproyecto delivery, proyecto de ejecución delivery, building permit submission and expected grant, construction start and completion). Provisions for suspension or termination — the client's right to terminate under CC Article 1594 (upon payment of the architect's work completed and loss of expected profit), and the architect's right to terminate for non-payment. Any suspension of services during prolonged permit delays or construction interruptions and the applicable standby fee must be addressed.

Under the Ley de Sociedades de Capital (LSC) RDL 1/2010, the Registro Mercantil maintains the register of Spanish companies. The Código de Comercio 1885 governs commercial obligations. The Agencia Estatal de Administración Tributaria (AEAT) administers Impuesto sobre Sociedades (IS) under Ley 27/2014. The Comisión Nacional de los Mercados y la Competencia (CNMC) enforces competition law. The Código Civil governs general contractual obligations under Article 1255.

Cite this page

CC BY 4.0 · free to cite

Reference this free template in an article, syllabus, or research note:

APA
Forms Legal. (2026). Architectural Works Contract Spain (Contrato de Obra de Arquitectura) (Spain) [Legal document template]. Forms Legal. https://forms-legal.com/espana/business/construction/architectural-works-contract-spain
MLA
"Architectural Works Contract Spain (Contrato de Obra de Arquitectura) (Spain)." Forms Legal, 2026, https://forms-legal.com/espana/business/construction/architectural-works-contract-spain.
Chicago
Forms Legal. "Architectural Works Contract Spain (Contrato de Obra de Arquitectura) (Spain)." Forms Legal, 2026. https://forms-legal.com/espana/business/construction/architectural-works-contract-spain.
BibTeX
@misc{formslegal-architectural-works-contract-spain,
  author       = {{Forms Legal}},
  title        = {Architectural Works Contract Spain (Contrato de Obra de Arquitectura) (Spain)},
  year         = {2026},
  howpublished = {\url{https://forms-legal.com/espana/business/construction/architectural-works-contract-spain}},
  note         = {Free legal document template}
}
Wikipedia
{{cite web |title=Architectural Works Contract Spain (Contrato de Obra de Arquitectura) (Spain) |website=Forms Legal |publisher=Forms Legal |date=2026 |url=https://forms-legal.com/espana/business/construction/architectural-works-contract-spain}}
RIS
TY  - ELEC
T1  - Architectural Works Contract Spain (Contrato de Obra de Arquitectura) (Spain)
T2  - Forms Legal
PB  - Forms Legal
PY  - 2026
UR  - https://forms-legal.com/espana/business/construction/architectural-works-contract-spain
ER  - 
Forms LegalUpdated 2026-06-06.bib.ris

Frequently Asked Questions

Statute-referenced template — Template last modified June 2026

This template is provided for informational purposes only and does not constitute legal advice. Laws vary by jurisdiction and change over time. Consult a qualified attorney for advice specific to your situation.Full disclaimer