Construction Start Certificate Colombia (Acta de Inicio de Obra)
ACTA DE INICIO DE OBRA
Conforme a Ley 400 de 1997 y Decreto 1077 de 2015
1. IDENTIFICACION DEL PROYECTO
Nombre del Proyecto: [Project Name]
Direccion: [Project Address]
Cedula Catastral: [Cedula Catastral]
Tipo de Proyecto: [Project Type]
Area Autorizada: [Authorized Area]
2. LICENCIA DE CONSTRUCCION
Licencia No.: [Licencia Number]
Fecha de Expedicion: [Licencia Date]
Fecha de Vencimiento: [Licencia Expiry]
Entidad Expedidora: [Curaduria]
Se deja constancia de que la licencia de construccion se encuentra vigente a la fecha de suscripcion de la presente acta, de conformidad con el Articulo 2.2.6.1.2.4.5 del Decreto 1077 de 2015.
3. PARTES INTERVINIENTES
PROPIETARIO / ENTIDAD CONTRATANTE:
Nombre: [Owner Name]
NIT: [Owner NIT]
Representante Legal: [Owner Representative]
C.C.: [Owner Rep CC]
CONTRATISTA:
Razon Social: [Contractor Name]
NIT: [Contractor NIT]
Representante Legal: [Contractor Rep]
C.C.: [Contractor Rep CC]
4. EQUIPO PROFESIONAL
Director de Obra: [Director Name]
Matricula Profesional: [Director Matricula]
Ingeniero/Arquitecto Residente: [Resident Engineer]
Interventor: [Interventor Name]
Los profesionales aqui identificados declaran poseer matricula profesional vigente expedida por COPNIA (Ley 842 de 2003) o CPNAA (Ley 435 de 1998), segun corresponda, y asumen la responsabilidad tecnica del proyecto conforme al Articulo 33 de la Ley 400 de 1997 y la Norma Sismo Resistente NSR-10.
5. PLAZO DE EJECUCION
Fecha de Inicio de Obra: [Start Date]
Plazo de Ejecucion: [Project Duration]
Fecha Estimada de Terminacion: [Expected Completion]
Contrato No.: [Contract Number]
A partir de la fecha de inicio aqui consignada, comienzan a correr los plazos contractuales, los periodos de garantia, y las obligaciones de supervision tecnica establecidas en el contrato de obra y la normatividad vigente.
6. POLIZAS Y GARANTIAS
Poliza de Cumplimiento: [Performance Bond]
Poliza de Responsabilidad Civil Extracontractual: [Liability Insurance]
Poliza de Estabilidad de Obra: [Stability Guarantee]
Se verifica que las polizas se encuentran vigentes y debidamente aprobadas, cubriendo los riesgos establecidos en la Ley 80 de 1993, la Ley 1796 de 2016, y el Decreto 1082 de 2015.
7. SEGURIDAD Y SALUD EN EL TRABAJO
El contratista declara tener implementado el Sistema de Gestion de Seguridad y Salud en el Trabajo (SG-SST) conforme al Decreto 1072 de 2015 y la Resolucion 0312 de 2019. Se confirma la afiliacion vigente de todos los trabajadores a la ARL correspondiente y el cumplimiento de la Resolucion 1409 de 2012 para trabajos en alturas.
8. CONDICIONES DEL SITIO
Se deja constancia de que el sitio de la obra ha sido inspeccionado conjuntamente por las partes, verificando las condiciones topograficas, accesos, estado de las redes de servicios publicos, y la ausencia de impedimentos fisicos o legales para el inicio de la construccion. Se anexa registro fotografico del estado actual del terreno como parte integral de la presente acta.
9. DECLARACIONES
Las partes declaran:
a) Que la licencia de construccion se encuentra vigente y sin modificaciones pendientes.
b) Que los diseños estructurales cumplen con la Norma Sismo Resistente NSR-10 (Decreto 926 de 2010).
c) Que el contratista cuenta con la capacidad tecnica, financiera y administrativa para ejecutar la obra.
d) Que las polizas y garantias exigidas por ley se encuentran vigentes y aprobadas.
e) Que el SG-SST se encuentra implementado conforme al Decreto 1072 de 2015.
FIRMAS
En [Sign City], a los [Sign Date].
PROPIETARIO / ENTIDAD CONTRATANTE:
[Owner Name]
NIT: [Owner NIT]
Representante Legal: [Owner Representative]
Firma: _________________________
CONTRATISTA:
[Contractor Name]
NIT: [Contractor NIT]
Representante Legal: [Contractor Rep]
Firma: _________________________
DIRECTOR DE OBRA:
[Director Name]
Matricula Profesional: [Director Matricula]
Firma: _________________________
INTERVENTOR:
[Interventor Name]
Firma: _________________________
Owner / Contracting Entity (Propietario / Entidad Contratante)
________________
Signature
Contractor (Contratista)
________________
Signature
Project Director (Director de Obra)
________________
Signature
Project Supervisor (Interventor)
________________
Signature
What Is a Construction Start Certificate Colombia (Acta de Inicio de Obra)?
A Construction Start Certificate Colombia (Acta de Inicio de Obra) is a formal document that records the official commencement date of a construction project within Colombian territory, establishing the baseline from which contractual deadlines, penalty clauses, and regulatory compliance periods are measured. Ley 400 de 1997, which governs the technical standards for seismic-resistant construction in Colombia, requires that all building projects comply with the Reglamento Colombiano de Construccion Sismo Resistente NSR-10 adopted through Decreto 926 de 2010 and its amendments in Decreto 2525 de 2010 and Decreto 092 de 2011. The Acta de Inicio serves as the foundational timestamp proving that construction began only after all required permits were secured.
Decree 1469 de 2010, which regulated the issuance of urban planning licences before its consolidation into the Decreto Unico Reglamentario 1077 de 2015 (Sector Vivienda, Ciudad y Territorio), established that no construction work may begin without a valid licencia de construccion issued by the municipal Curaduria Urbana or the corresponding planning office. Article 2.2.6.1.2.1.1 of Decreto 1077 de 2015 defines the licencia de construccion as the prior authorization for developing buildings on land within the jurisdiction of a municipality or distrito. The Acta de Inicio formally certifies that the licencia is current, that the contractor holds the required matricula profesional from the Consejo Profesional Nacional de Ingenieria (COPNIA) or the Consejo Profesional de Arquitectura y sus Profesiones Auxiliares (CPNAA), and that the project director has been duly appointed.
Under the Estatuto General de Contratacion de la Administracion Publica — Ley 80 de 1993, as modified by Ley 1150 de 2007 and regulated by Decreto 1082 de 2015 (now consolidated in Decreto 1082 de 2015 Sector Planeacion) — public works contracts require an Acta de Inicio signed by both the contracting entity (entidad contratante) and the contractor (contratista) before any physical work begins. The Agencia Nacional de Contratacion Publica — Colombia Compra Eficiente provides standard formats that include the Acta de Inicio as a mandatory contractual milestone under the Manual de Contratacion.
For private construction projects, the Acta de Inicio serves equally critical functions. Ley 1796 de 2016 (Ley de Vivienda Segura) established mandatory quality controls for residential construction, requiring builders to register with the Registro Nacional de Constructores Responsables de Vivienda maintained by the Superintendencia de Industria y Comercio (SIC). Article 8 of Ley 1796 de 2016 mandates that every residential project obtain a certificate of technical supervision (certificado de supervision tecnica independiente) from a licensed professional engineer, and the Acta de Inicio marks the point at which such supervision must be active and documented.
The Ministerio de Vivienda, Ciudad y Territorio oversees compliance with urban development regulations at the national level, while municipal Secretarias de Planeacion and Curadurias Urbanas enforce local Plans de Ordenamiento Territorial (POT) established under Ley 388 de 1997. The Acta de Inicio must reference the specific POT provisions, land use classification (uso del suelo), and volumetric parameters (indice de construccion and indice de ocupacion) authorized by the licencia. Environmental considerations are governed by the Autoridad Nacional de Licencias Ambientales (ANLA) under Decreto 1076 de 2015 when the project requires an environmental licence, and by the Corporaciones Autonomas Regionales for projects requiring environmental management plans.
Occupational health and safety on construction sites is regulated by Decreto 1072 de 2015 (Decreto Unico Reglamentario del Sector Trabajo), which requires implementation of the Sistema de Gestion de Seguridad y Salud en el Trabajo (SG-SST). Resolucion 0312 de 2019 from the Ministerio del Trabajo establishes minimum standards for the SG-SST. The Acta de Inicio should confirm that the contractor has an active SG-SST, current ARL (Administradora de Riesgos Laborales) affiliation for all site workers, and compliance with Resolucion 1409 de 2012 governing work at heights in the construction sector.
When Do You Need a Construction Start Certificate Colombia (Acta de Inicio de Obra)?
A Construction Start Certificate Colombia is required at the precise moment a construction project transitions from planning and permitting to physical execution on site. Under Decreto 1077 de 2015, Article 2.2.6.1.2.4.5, the licencia de construccion has a defined validity period — typically 24 months from issuance — and the Acta de Inicio establishes that construction commenced within this validity window. Failure to begin construction before the licencia expires requires the titleholder to apply for a prorroga (extension) or obtain a new licencia through the Curaduria Urbana.
Public works contracts governed by the Estatuto General de Contratacion (Ley 80 de 1993) and the procurement regulations of Decreto 1082 de 2015 mandate the Acta de Inicio as a contractual prerequisite before any disbursement of public funds. The interventor (project supervisor appointed by the contracting entity) and the contratista must jointly sign the Acta de Inicio, which activates the contractual timeline for milestone payments (actas parciales), penalty calculations (clausula penal), and the overall project duration established in the contract.
Residential construction projects subject to Ley 1796 de 2016 require the Acta de Inicio to activate the ten-year structural warranty (garantia decenal) period mandated by Article 7. The Registro Nacional de Constructores Responsables tracks this date to determine warranty coverage periods. Insurance companies issuing polizas de responsabilidad decenal under Decreto 282 de 2019 use the Acta de Inicio date to calculate premium periods and coverage commencement.
The Acta de Inicio is also needed when a construction project involves multiple phases or stages (etapas). Ley 675 de 2001 (Regimen de Propiedad Horizontal) requires that multi-phase condominium projects document the start of each construction stage separately, as each stage generates independent obligations regarding common areas, structural specifications, and delivery timelines. Municipal planning authorities track these dates for urbanization compliance under the POT.
Contractors seeking to demonstrate compliance with the Sistema de Gestion de Seguridad y Salud en el Trabajo (SG-SST) must have the Acta de Inicio as evidence that safety protocols were active from day one of construction. The Ministerio del Trabajo inspectors verify this documentation during site inspections under Decreto 1072 de 2015. The ARL (Administradora de Riesgos Laborales) requires the Acta de Inicio date to establish coverage periods for workplace accident claims on the specific construction site.
What to Include in Your Construction Start Certificate Colombia (Acta de Inicio de Obra)
A valid Construction Start Certificate Colombia under Ley 400 de 1997, Decreto 1077 de 2015, and applicable procurement regulations must contain the following essential elements to serve as legally binding proof of project commencement.
Project Identification: Full name of the construction project, address or geographical coordinates of the construction site, and the cadastral identification number (cedula catastral) assigned by the municipal Catastro. For projects within a Plan de Ordenamiento Territorial (Ley 388 de 1997), the specific land use classification (uso del suelo), maximum construction index (indice de construccion), and maximum occupation index (indice de ocupacion) authorized by the licencia must be referenced.
Licencia de Construccion Details: The licencia number, date of issuance, issuing Curaduria Urbana or municipal planning office, validity period, and authorized construction area in square meters. Under Decreto 1077 de 2015 Article 2.2.6.1.2.3.1, the licencia must specify the approved building type (vivienda, comercial, institucional, industrial, or mixed use), the number of floors authorized, and any special conditions imposed by the Curaduria.
Parties Identification: Full legal name and NIT (Numero de Identificacion Tributaria) of the owner (propietario), the contractor (contratista), the project director (director de obra), and the construction supervisor (interventor) when applicable. For public works under Ley 80 de 1993, the contracting entity (entidad contratante), the legal representative, and the designated interventor must be identified with their respective positions and professional credentials.
Professional Credentials: The matricula profesional number of the project director and the resident engineer or architect, issued by COPNIA (Consejo Profesional Nacional de Ingenieria — Ley 842 de 2003) or CPNAA (Consejo Profesional de Arquitectura — Ley 435 de 1998). Ley 400 de 1997 Article 33 requires that the designer, reviewer, construction supervisor, and geotechnical engineer each hold valid professional licences and be registered in the project documentation.
Site Conditions: Description of the physical conditions of the construction site at the moment of commencement, including topography, existing structures (if any), access roads, utility connections (water, sewage, electricity), and any environmental conditions noted. Photographic evidence of the site condition is standard practice and serves as baseline documentation for dispute resolution.
Project Timeline: The official start date, projected completion date, and the total authorized construction period in calendar days. For public contracts, Decreto 1082 de 2015 requires that the timeline be consistent with the contract terms and the execution schedule (cronograma de ejecucion) approved by the interventor.
Insurance and Guarantees: Reference to active insurance policies — poliza de cumplimiento (performance bond), poliza de responsabilidad civil extracontractual (third-party liability), poliza de estabilidad de obra (structural stability guarantee of five years under Ley 80 de 1993), and poliza de responsabilidad decenal (ten-year structural warranty under Ley 1796 de 2016 for residential projects). The insurance company name, policy numbers, coverage amounts, and validity periods must be recorded.
Occupational Safety Compliance: Confirmation that the contractor has an active Sistema de Gestion de Seguridad y Salud en el Trabajo (SG-SST) under Decreto 1072 de 2015, current ARL affiliation for all site workers, and compliance with Resolucion 1409 de 2012 for work at heights and Resolucion 0312 de 2019 for minimum SG-SST standards.
Forms-legal.com provides this Construction Start Certificate Colombia template as a practical starting point for documenting construction commencement. Each project should be reviewed by a licensed abogado especialista en derecho de la construccion or ingeniero civil to confirm compliance with the applicable municipal POT, the Curaduria Urbana requirements, and the specific contractual obligations of the parties.
Cite this page
Reference this free template in an article, syllabus, or research note:
Forms Legal. (2026). Construction Start Certificate Colombia (Acta de Inicio de Obra) (Colombia) [Legal document template]. Forms Legal. https://forms-legal.com/colombia/business/construction/construction-start-certificate-colombia
"Construction Start Certificate Colombia (Acta de Inicio de Obra) (Colombia)." Forms Legal, 2026, https://forms-legal.com/colombia/business/construction/construction-start-certificate-colombia.
@misc{formslegal-construction-start-certificate-colombia,
author = {{Forms Legal}},
title = {Construction Start Certificate Colombia (Acta de Inicio de Obra) (Colombia)},
year = {2026},
howpublished = {\url{https://forms-legal.com/colombia/business/construction/construction-start-certificate-colombia}},
note = {Free legal document template}
}Frequently Asked Questions
El Acta de Inicio de Obra en el derecho colombiano de la construccion constituye el registro oficial que establece la fecha exacta en que comienzan los trabajos fisicos de construccion en un predio. Conforme al Estatuto General de Contratacion (Ley 80 de 1993, modificada por la Ley 1150 de 2007), el Acta de Inicio activa todos los cronogramas contractuales, incluyendo los calendarios de pagos parciales, las clausulas penales pecuniarias y el plazo total del proyecto. El Decreto 1082 de 2015 exige que los contratos de obra publica incluyan el Acta de Inicio como documento contractual obligatorio suscrito por el interventor y el contratista. Para proyectos privados, el Acta de Inicio acredita el cumplimiento del plazo de vigencia de la licencia de construccion establecido en el Articulo 2.2.6.1.2.4.5 del Decreto 1077 de 2015, probando que la obra comenzo antes del vencimiento del permiso. El documento tambien activa el inicio de los periodos de garantia: la garantia de estabilidad de obra de cinco anos bajo la Ley 80 de 1993 para obras publicas y la garantia decenal de estabilidad estructural bajo el Articulo 7 de la Ley 1796 de 2016 para construccion residencial. Las aseguradoras utilizan la fecha del Acta de Inicio para calcular los periodos de prima de polizas de cumplimiento y polizas de responsabilidad decenal conforme al Decreto 282 de 2019.
En los contratos de obra publica regidos por la Ley 80 de 1993 y el Decreto 1082 de 2015, el Acta de Inicio debe ser suscrita por multiples partes con roles juridicos diferenciados. El contratista o su representante legal firma en nombre de la empresa constructora, confirmando la disposicion para iniciar los trabajos y la aceptacion de las obligaciones contractuales. El interventor, designado por la entidad contratante conforme al Articulo 83 de la Ley 1474 de 2011, firma para certificar que se han cumplido todos los prerequisitos contractuales, incluida la aprobacion del cronograma de ejecucion, la presentacion de polizas de cumplimiento y responsabilidad civil, y la verificacion del cumplimiento del SG-SST del contratista bajo el Decreto 1072 de 2015. El supervisor del contrato firma como representante oficial de la entidad publica. El director de obra, quien debe tener matricula profesional vigente de COPNIA (Ley 842 de 2003) o CPNAA (Ley 435 de 1998), firma para asumir la responsabilidad tecnica de la construccion. Para proyectos sujetos a la Ley 1796 de 2016, el supervisor tecnico independiente tambien debe reconocer la fecha de inicio. Los formatos estandar de Colombia Compra Eficiente exigen que todos los firmantes incluyan su cedula de ciudadania y credenciales profesionales.
Iniciar una obra de construccion sin licencia vigente en Colombia constituye una infraccion urbanistica conforme al Articulo 104 de la Ley 388 de 1997, regulada por el Decreto 1077 de 2015. La Secretaria de Planeacion municipal o la alcaldia tiene facultad para ordenar la suspension inmediata de los trabajos (orden de suspension) e imponer multas sucesivas de hasta 15 salarios minimos mensuales legales vigentes por metro cuadrado de construccion no autorizada, segun el Articulo 1 de la Ley 810 de 2003 que modifico el Articulo 104 de la Ley 388 de 1997. Si el infractor desacata la orden de suspension, el municipio puede ordenar la demolicion a costo del propietario. Puede configurarse responsabilidad penal conforme al Articulo 318 del Codigo Penal (Ley 599 de 2000) por urbanizacion ilegal cuando la construccion viola el Plan de Ordenamiento Territorial. La Curaduria Urbana lleva un registro de infractores, y los reincidentes enfrentan sanciones incrementadas. En contratos publicos, construir sin licencia constituye falta disciplinaria investigada por la Procuraduria General de la Nacion y puede generar hallazgos de responsabilidad fiscal por la Contraloria General de la Republica bajo la Ley 610 de 2000.
El Reglamento Colombiano de Construccion Sismo Resistente NSR-10, adoptado mediante el Decreto 926 de 2010 y modificado por el Decreto 2525 de 2010, establece los estandares obligatorios de diseño estructural y construccion para todas las edificaciones en territorio colombiano. El Articulo 33 de la Ley 400 de 1997 exige que cada proyecto de construccion designe un disenador estructural, un revisor de diseños, un supervisor tecnico y un ingeniero geotecnista, todos con matricula profesional vigente de COPNIA. El Acta de Inicio debe confirmar que estos profesionales han sido designados y que los diseños estructurales cumplen con los mapas de zonificacion sismica de la NSR-10 — Colombia se divide en zonas de amenaza sismica alta, intermedia y baja segun el Titulo A de la NSR-10. La Curaduria Urbana revisa el cumplimiento estructural antes de expedir la licencia de construccion, y el Acta de Inicio referencia ese diseño aprobado. Bajo la Ley 1796 de 2016, el supervisor tecnico independiente debe certificar el cumplimiento continuo de la NSR-10 durante toda la construccion, marcando el Acta de Inicio el inicio de esta obligacion de supervision permanente. El incumplimiento de la NSR-10 detectado despues de la fecha del Acta de Inicio puede generar sanciones administrativas de la Curaduria y responsabilidad civil bajo el regimen de garantia decenal.
La ley colombiana exige que varias polizas de seguros esten vigentes antes de suscribir validamente el Acta de Inicio de Obra. Para contratos de obra publica bajo el Numeral 19 del Articulo 25 de la Ley 80 de 1993 y la Seccion 3 del Decreto 1082 de 2015, el contratista debe presentar: una poliza de cumplimiento que garantice la ejecucion fiel del contrato, generalmente por el 10-20% del valor contractual; una poliza de estabilidad de obra que cubra defectos durante cinco anos despues de la terminacion; una poliza de responsabilidad civil extracontractual que cubra daños a terceros durante la construccion; y una poliza de pago de salarios y prestaciones sociales. Para proyectos de vivienda sujetos a la Ley 1796 de 2016 y al Decreto 282 de 2019, el constructor debe obtener una poliza de responsabilidad decenal antes de la primera venta o entrega de unidades — la fecha del Acta de Inicio establece el punto de referencia para esta cobertura. El interventor verifica que todas las polizas esten vigentes y debidamente aprobadas, emitidas por aseguradoras vigiladas por la Superintendencia Financiera de Colombia. Las polizas deben nombrar como beneficiario a la entidad contratante o al propietario del proyecto.
Una vez suscrito el Acta de Inicio, la ley colombiana contempla mecanismos de modificacion y suspension de proyectos de construccion. Bajo el Articulo 14 de la Ley 80 de 1993 y el Decreto 1082 de 2015, los contratos de obra publica pueden suspenderse mediante un Acta de Suspension suscrita por el interventor y el contratista, que pausa el cronograma contractual — el periodo de suspension no computa en el plazo de ejecucion establecido en el Acta de Inicio. Las causales de suspension incluyen fuerza mayor conforme a los Articulos 64 y 1604 del Codigo Civil, circunstancias imprevistas, ordenes judiciales o decisiones administrativas de la entidad contratante. La reanudacion se formaliza mediante un Acta de Reinicio que reactiva el cronograma desde el punto de suspension. Las modificaciones al alcance del proyecto requieren un otrosi bajo el Articulo 16 de la Ley 80 de 1993, que puede ampliar el plazo original hasta en un 50% del plazo inicial. Para proyectos privados, la vigencia de la licencia de construccion sigue corriendo independientemente de las suspensiones — el titular debe solicitar una prorroga antes del vencimiento conforme al Articulo 2.2.6.1.2.4.5 del Decreto 1077 de 2015.
Los sitios de construccion en Colombia deben contar con documentacion integral de seguridad y salud en el trabajo al momento de suscribir el Acta de Inicio. El Decreto 1072 de 2015 (Decreto Unico Reglamentario del Sector Trabajo) exige que todo empleador implemente el Sistema de Gestion de Seguridad y Salud en el Trabajo (SG-SST) para todos los trabajadores del sitio. La Resolucion 0312 de 2019 del Ministerio del Trabajo establece los estandares minimos del SG-SST segun el tamaño de la empresa y la clasificacion de riesgo — la construccion corresponde a Clase de Riesgo V (riesgo maximo). El contratista debe presentar: certificados de afiliacion vigente a la ARL (Administradora de Riesgos Laborales) de todos los trabajadores del sitio bajo la Ley 1562 de 2012; el documento del plan de SG-SST que incluya matrices de identificacion de peligros y valoracion de riesgos; el programa de trabajo seguro en alturas bajo la Resolucion 1409 de 2012 con certificados para trabajadores en tareas a mas de 1,5 metros; planes de emergencia conforme al Articulo 2.2.4.6.25 del Decreto 1072 de 2015; y evidencia de la induccion en seguridad para todo el personal. Para contratistas con mas de 10 trabajadores, el Comite Paritario de Seguridad y Salud en el Trabajo (COPASST) debe estar constituido conforme a la Resolucion 2013 de 1986. El interventor verifica esta documentacion antes de suscribir el Acta de Inicio.
This template is provided for informational purposes only and does not constitute legal advice. Laws vary by jurisdiction and change over time. Consult a qualified attorney for advice specific to your situation.Full disclaimer
Found an error? Let us knowRelated Documents
You may also find these documents useful:
Acta de Recibo Final de Obra Colombia
Acta de Recibo Final de Obra para Colombia conforme a la Ley 400 de 1997 y el Articulo 2060 del Codigo Civil, que documenta formalmente la aceptacion final de un proyecto de construccion terminado por el propietario o la entidad contratante, certificando el cumplimiento de los diseños aprobados, la Norma NSR-10 y las especificaciones contractuales.
Acta de Recibo Parcial de Obra Colombia
Acta de Recibo Parcial de Obra para Colombia conforme a la Ley 400 de 1997 y el Código Civil Artículo 2060, que documenta formalmente la aceptación de una fase o hito de construcción completado, autoriza pagos parciales y registra el porcentaje de ejecución del contrato frente al cronograma de construcción aprobado.