Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra)

A Construction Completion and Acceptance Certificate Colombia is a formal document through which the project owner, contracting entity, or their authorized representative formally accepts the completed construction works from the contractor…

Key facts

ColombiaColombiaEnglish (CO)FreePDF & Word
Legal basisLey 400 de 1997; Código Civil art. 2060Signature lines in this template: 5 parties
Construction Completion and Acceptance Certificate (Acta de Recibo de Obra)

ACTA DE RECIBO FINAL DE OBRA

Conforme a Ley 400 de 1997 y Código Civil Art. 2060

1. IDENTIFICACIÓN DEL PROYECTO

Nombre del Proyecto: [Project Name]

Direccion: [Project Address]

Tipo de Proyecto: [Project Type]

Licencia de Construcción No.: [Licencia Number]

Contrato No.: [Contract Number]

Fecha del Contrato: [Contract Date]

2. PARTES INTERVINIENTES

PROPIETARIO / ENTIDAD CONTRATANTE:

Nombre: [Owner Name]

NIT: [Owner NIT]

Representante Legal: [Owner Representative]

C.C.: [Owner Rep CC]

CONTRATISTA:

Razon Social: [Contractor Name]

NIT: [Contractor NIT]

Representante Legal: [Contractor Rep]

C.C.: [Contractor Rep CC]

3. EQUIPO PROFESIONAL

Director de Obra: [Director Name]

Matricula Profesional: [Director Matricula]

Interventor: [Interventor Name]

Supervisor Tecnico Independiente: [Supervisor Tecnico]

4. RESUMEN DE PLAZOS

Fecha de Inicio (Acta de Inicio): [Start Date]

Plazo Original: [Original Duration]

Prorrogas Autorizadas: [Extensions]

Fecha Real de Terminación: [Completion Date]

Fecha de Recibo: [Acceptance Date]

5. VERIFICACIÓN DE TERMINACIÓN Y CUMPLIMIENTO

[Completion Statement]

El interventor y el director de obra certifican que la construcción fue ejecutada conforme a los planos aprobados, las especificaciones técnicas contractuales, y el Reglamento Colombiano de Construcción Sismo Resistente NSR-10 (Decreto 926 de 2010), cumpliendo los requisitos del Artículo 33 de la Ley 400 de 1997.

Observaciones Pendientes:

[Pending Items]

Valor Final del Contrato: [Contract Value]

6. CUMPLIMIENTO LABORAL Y DE SEGURIDAD SOCIAL

El contratista declara y el interventor verifica que se cumplieron todas las obligaciones laborales durante la ejecución de la obra, incluyendo: afiliación de trabajadores a EPS, AFP/Colpensiones, y ARL conforme a la Ley 100 de 1993; pago oportuno de aportes parafiscales a CCF, ICBF, y SENA; cumplimiento del SG-SST conforme al Decreto 1072 de 2015 y la Resolución 0312 de 2019; y pago de todas las prestaciones sociales causadas durante el periodo de construcción.

7. GARANTIAS Y POLIZAS POST-CONSTRUCCION

A partir de la fecha de recibo consignada en la presente acta, entran en vigencia las siguientes garantías:

Póliza de Estabilidad de Obra (5 años): [Stability Guarantee]

Póliza de Calidad del Bien: [Quality Guarantee]

Garantia Decenal (Ley 1796/2016): [Decennial Warranty]

PARAGRAFO. — La aceptación de la obra no exime al contratista de la responsabilidad por vicios ocultos que se manifiesten con posterioridad, conforme al Artículo 2060 numeral 3 del Código Civil, ni de la garantía decenal establecida en el Artículo 7 de la Ley 1796 de 2016 para proyectos de vivienda.

FIRMAS

En [Sign City], a los [Sign Date].

PROPIETARIO / ENTIDAD CONTRATANTE:

[Owner Name]

NIT: [Owner NIT]

Representante Legal: [Owner Representative]

Firma: _________________________

CONTRATISTA:

[Contractor Name]

NIT: [Contractor NIT]

Representante Legal: [Contractor Rep]

Firma: _________________________

DIRECTOR DE OBRA:

[Director Name]

Matricula: [Director Matricula]

Firma: _________________________

INTERVENTOR:

[Interventor Name]

Firma: _________________________

SUPERVISOR TECNICO INDEPENDIENTE:

[Supervisor Tecnico]

Firma: _________________________

Owner / Contracting Entity (Propietario / Entidad Contratante)

________________

Signature

Contractor (Contratista)

________________

Signature

Project Director (Director de Obra)

________________

Signature

Project Supervisor (Interventor)

________________

Signature

Technical Supervisor (Supervisor Tecnico Independiente)

________________

Signature

What Is a Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra)?

A Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra) is a formal document through which the project owner (propietario), contracting entity (entidad contratante), or their authorized representative formally accepts the completed construction works from the contractor (contratista), certifying that all contractual obligations have been fulfilled and that the finished project complies with the approved designs, applicable building codes, and the Norma Sismo Resistente NSR-10 adopted through Decreto 926 de 2010.

Codigo Civil Article 2060 of the Colombian Civil Code — Ley 57 de 1887 — governs the contract for construction of material works (contrato de confeccion de obra material), establishing that the contractor is liable for defects in the construction and that final acceptance by the owner does not release the contractor from liability for hidden defects (vicios ocultos) that become apparent after delivery. Article 2060 numeral 3 specifically provides that if the building collapses within ten years due to defects in the soil or construction, the contractor and architect are jointly liable — a principle reinforced and expanded by Ley 1796 de 2016 (Ley de Vivienda Segura).

Ley 400 de 1997 established the framework for seismic-resistant construction in Colombia and mandated compliance with the NSR-10 technical standards. Under Article 33, the construction supervisor (supervisor tecnico) must certify at project completion that the building was constructed in accordance with the approved structural designs and the NSR-10 requirements. The Acta de Recibo de Obra serves as the formal moment at which this certification is documented and the project transitions from the construction phase to the operational phase.

For public works contracts governed by the Estatuto General de Contratacion de la Administracion Publica (Ley 80 de 1993), the Acta de Recibo de Obra is a prerequisite for contract liquidation (liquidacion del contrato) under Article 60, as modified by Ley 1150 de 2007 Article 11. The interventor (project supervisor) must verify that all contracted works have been completed, that the quality meets the technical specifications, and that the contractor has fulfilled all labor, social security, and parafiscal obligations. Decreto 1082 de 2015 establishes that the liquidation must occur within the term established in the contract or, absent such provision, within four months after completion.

Ley 1796 de 2016 introduced additional requirements for residential construction projects. Article 7 mandates a ten-year structural warranty (garantia decenal) covering the stability of the building, and Article 8 requires a certificate from the supervisor tecnico independiente confirming that the construction complies with the approved structural designs and NSR-10. The Acta de Recibo de Obra for residential projects must reference this certification and activate the warranty period tracked by the Registro Nacional de Constructores Responsables de Vivienda maintained by the Superintendencia de Industria y Comercio (SIC).

The Acta de Recibo de Obra also triggers the commencement of guarantee periods for insurance policies. Under Ley 80 de 1993, the poliza de estabilidad de obra (structural stability guarantee) of five years begins from the date of final acceptance. The poliza de calidad del bien (quality guarantee) covers defects in finishing and materials for the period established in the contract. Insurance companies supervised by the Superintendencia Financiera de Colombia use the Acta de Recibo de Obra date as the reference point for calculating coverage periods and processing claims.

Municipal planning authorities — Curadurias Urbanas and Secretarias de Planeacion — require evidence of project completion for issuing the certificado de ocupacion or permiso de ocupacion under Decreto 1077 de 2015, which authorizes the building to be inhabited or used for its intended purpose. The Acta de Recibo de Obra, together with the paz y salvo de obra (construction clearance certificate) issued by the Curaduria, forms the basis for obtaining this occupancy authorization.

When Do You Need a Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra)?

A Construction Completion and Acceptance Certificate Colombia is required at the conclusion of a construction project when all contractual works have been completed and the owner or contracting entity is ready to formally accept the finished product from the contractor. Under Codigo Civil Article 2060, the acceptance constitutes the formal acknowledgment that the contractor has fulfilled their primary obligation of delivering the completed work in accordance with the agreed specifications.

For public works contracts under the Estatuto General de Contratacion (Ley 80 de 1993), the Acta de Recibo de Obra is a mandatory prerequisite for initiating the contract liquidation process under Article 60. Without a signed Acta de Recibo, the contracting entity cannot proceed to calculate final payments, release retained guarantees, or close the contractual file with Colombia Compra Eficiente (SECOP II). The interventor must verify completion before recommending acceptance to the contracting entity.

Residential construction projects subject to Ley 1796 de 2016 require the Acta de Recibo de Obra to activate the ten-year structural warranty (garantia decenal) mandated by Article 7. The Registro Nacional de Constructores Responsables records this date, and the Superintendencia de Industria y Comercio uses it as the reference point for warranty claims. Property buyers (compradores de vivienda nueva) may invoke the warranty before the SIC when structural defects appear within the ten-year period.

The document is needed for obtaining the municipal occupancy authorization. Under Decreto 1077 de 2015, the Curaduria Urbana or Secretaria de Planeacion issues a certificado de ocupacion or permiso de uso after verifying that the construction was completed in accordance with the licencia de construccion. The Acta de Recibo de Obra demonstrates that the technical team has certified completion, enabling the occupancy process.

Insurance companies require the Acta de Recibo de Obra to activate post-construction guarantee policies. The poliza de estabilidad de obra (five-year structural stability) and the poliza de calidad (quality guarantee for finishing and materials) both commence from the date of final acceptance recorded in the acta. Claims for construction defects submitted to the insurance company must reference the acceptance date.

The Acta de Recibo de Obra is also necessary for the contractor to present the final invoice (factura final) and claim payment of any retained amounts (retenciones de garantia). Under standard construction contracts, owners typically retain 5-10% of each progress payment as a guarantee fund, released only after final acceptance and during the liquidation process.

What to Include in Your Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra)

A valid Construction Completion and Acceptance Certificate Colombia under Ley 400 de 1997, Codigo Civil Article 2060, and applicable procurement regulations must contain the following essential elements.

Project Identification: Full name of the construction project, address, cadastral identification (cedula catastral), and the construction type authorized by the licencia de construccion. The licencia number, issuing Curaduria Urbana, and date of issuance must be referenced to confirm that the completed works correspond to the authorized project under Decreto 1077 de 2015.

Contract Reference: The construction contract number, date of execution, and the names and identification of the contracting parties — the owner or contracting entity (propietario or entidad contratante) and the contractor (contratista). For public works, the SECOP II reference number and the procurement modality under Decreto 1082 de 2015 must be included.

Parties Identification: Full legal name and NIT of the project owner and contractor, plus identification of the project director (director de obra), resident engineer or architect, and interventor (project supervisor). Professional credentials — matricula profesional from COPNIA (Ley 842 de 2003) or CPNAA (Ley 435 de 1998) — must be referenced for all technical personnel.

Completion Verification: A detailed statement confirming that all construction works described in the contract have been completed in accordance with the approved designs, technical specifications, and the Norma Sismo Resistente NSR-10. The interventor certifies that quality control inspections were conducted throughout the construction process and that all deficiencies identified during construction have been corrected.

Timeline Summary: Reference to the Acta de Inicio date, the original project duration, any authorized extensions (prorrogas or otrosies), and the actual completion date. For public contracts, calculation of whether completion occurred within the contractual timeline or with delays, and documentation of any penalty calculations (clausula penal) or force majeure events.

Punch List Resolution (Observaciones Subsanadas): Confirmation that all items identified in previous inspection reports and partial acceptance certificates have been resolved. The acta must specify whether acceptance is unconditional or subject to the correction of minor pending items within a defined period.

Insurance and Guarantee Activation: Reference to the poliza de estabilidad de obra (five-year structural stability under Ley 80 de 1993), poliza de calidad del bien (quality guarantee), and poliza de responsabilidad decenal (ten-year warranty under Ley 1796 de 2016 for residential projects). The acceptance date triggers the commencement of all post-construction guarantee periods.

NSR-10 Compliance Certification: Statement from the supervisor tecnico that the completed construction complies with the Reglamento Colombiano de Construccion Sismo Resistente NSR-10 (Decreto 926 de 2010), including structural design conformity, materials testing results, and geotechnical compliance as required by Ley 400 de 1997 Article 33.

Labor and Social Security Compliance: Confirmation that the contractor has fulfilled all obligations regarding worker payments, social security contributions (EPS, AFP, ARL under Ley 100 de 1993), parafiscal contributions (CCF, ICBF, SENA), and compliance with the SG-SST under Decreto 1072 de 2015 throughout the construction period.

Each project should be reviewed by a licensed abogado especialista en derecho de la construccion to confirm compliance with the applicable contractual terms, municipal regulations, and the specific requirements of the Curaduria Urbana for occupancy authorization.

Additional compliance elements for a Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra) used in Colombia include: Under the Codigo de Comercio (Decreto 410 de 1971), the Camara de Comercio maintains the Registro Mercantil of Colombian companies. The Ley 1258 de 2008 governs Sociedades por Acciones Simplificadas (SAS). The Superintendencia de Sociedades supervises corporate governance. The DIAN (Direccion de Impuestos y Aduanas Nacionales) administers the Impuesto de Renta and IVA under the Estatuto Tributario (Decreto 624 de 1989).

Cite this page

CC BY 4.0 · free to cite

Reference this free template in an article, syllabus, or research note:

APA
Forms Legal. (2026). Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra) [Legal document template]. Forms Legal. https://forms-legal.com/colombia/business/construction/construction-completion-acceptance-certificate-colombia
MLA
"Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra)." Forms Legal, 2026, https://forms-legal.com/colombia/business/construction/construction-completion-acceptance-certificate-colombia.
Chicago
Forms Legal. "Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra)." Forms Legal, 2026. https://forms-legal.com/colombia/business/construction/construction-completion-acceptance-certificate-colombia.
BibTeX
@misc{formslegal-construction-completion-acceptance-certificate-colombia,
  author       = {{Forms Legal}},
  title        = {Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra)},
  year         = {2026},
  howpublished = {\url{https://forms-legal.com/colombia/business/construction/construction-completion-acceptance-certificate-colombia}},
  note         = {Free legal document template. Based on Ley 400 de 1997; Código Civil art. 2060}
}
Wikipedia
{{cite web |title=Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra) |website=Forms Legal |publisher=Forms Legal |date=2026 |url=https://forms-legal.com/colombia/business/construction/construction-completion-acceptance-certificate-colombia}}
RIS
TY  - ELEC
T1  - Construction Completion and Acceptance Certificate Colombia (Acta de Recibo de Obra)
T2  - Forms Legal
PB  - Forms Legal
PY  - 2026
UR  - https://forms-legal.com/colombia/business/construction/construction-completion-acceptance-certificate-colombia
ER  - 
Forms Legal

Frequently Asked Questions

¿Cual es el efecto jurídico de suscribir el Acta de Recibo Final de Obra en Colombia?

La suscripción del Acta de Recibo Final de Obra en Colombia produce varios efectos jurídicos significativos. Bajo el Artículo 2060 del Código Civil, la aceptación constituye el reconocimiento formal del propietario de que el contratista entrego la obra terminada conforme a las especificaciones contractuales. Para obras públicas bajo el Artículo 60 de la Ley 80 de 1993, el acta suscrita inicia el periodo de liquidación del contrato — cuatro meses bajo el Decreto 1082 de 2015 cuando el contrato no establece un plazo diferente. La fecha de aceptación activa los periodos de garantía post-construccion: la póliza de estabilidad de obra de cinco años bajo la Ley 80 de 1993, y la garantía decenal de diez años bajo el Artículo 7 de la Ley 1796 de 2016 para proyectos residenciales. El contratista queda habilitado para solicitar el pago de las retenciones de garantía y el saldo final del contrato. Es fundamental destacar que la aceptación no exime al contratista de responsabilidad por vicios ocultos bajo el Numeral 3 del Artículo 2060 del CC — si el edificio presenta defectos estructurales dentro de los diez años, el contratista y los profesionales de diseño permanecen solidariamente responsables independientemente de la aceptación. La Corte Suprema de Justicia Sala de Casación Civil ha sostenido consistentemente que la aceptación documentada en el Acta de Recibo cubre solo las condiciones aparentes al momento de la entrega, no los defectos que requieren tiempo para manifestarse.

¿Cual es la diferencia entre el Acta de Recibo de Obra y el Acta de Liquidación en Colombia?

El Acta de Recibo de Obra y el Acta de Liquidación son documentos distintos que ocurren en diferentes etapas del proceso de cierre contractual. El Acta de Recibo de Obra es el documento de aceptación técnica — suscrito por el interventor, el contratista y el propietario — que certifica que todas las obras físicas de construcción se han terminado y cumplen las especificaciones contractuales y los códigos de construcción aplicables, incluyendo la NSR-10. El Acta de Liquidación, regulada por el Artículo 60 de la Ley 80 de 1993 modificado por el Artículo 11 de la Ley 1150 de 2007, es el cierre financiero y administrativo del contrato — liquida todas las cuentas pendientes entre las partes, calcula los pagos finales o saldos adeudados, documenta cualquier reclamación u obligación pendiente y termina formalmente la relación contractual. La liquidación ocurre después de la aceptación y debe completarse dentro del plazo contractual o dentro de los cuatro meses siguientes a la aceptación bajo el Decreto 1082 de 2015. El documento de liquidación incluye: resumen financiero de todos los pagos realizados (actas parciales mas el acta final), liberación de retenciones, calculos de cláusula penal si aplica y paz y salvo mutuo entre las partes. Bajo la Ley 80 de 1993, si las partes no logran la liquidación bilateral, la entidad contratante puede proceder con la liquidación unilateral dentro de los dos meses siguientes.

¿Que periodos de garantía comienzan cuando se acepta un proyecto de construcción en Colombia?

Múltiples periodos de garantía comienzan desde la fecha registrada en el Acta de Recibo Final de Obra. La póliza de estabilidad de obra bajo la Ley 80 de 1993 otorga una garantía de estabilidad estructural de cinco años para contratos de obra publica — durante este periodo, el contratista debe reparar cualquier defecto estructural a su costo, y la aseguradora responde si el contratista incumple. Para proyectos de construcción residencial, el Artículo 7 de la Ley 1796 de 2016 establece una garantía decenal de diez años que cubre la estabilidad estructural del edificio — esta garantía es rastreada por el Registro Nacional de Constructores Responsables de la Superintendencia de Industria y Comercio (SIC) y las reclamaciones pueden presentarse directamente ante la SIC. La póliza de calidad del bien cubre defectos en materiales de acabados, instalaciones (hidraulicas, eléctricas, gas) y equipos por el periodo establecido en el contrato — generalmente uno o dos años. Bajo el Numeral 3 del Artículo 2060 del Código Civil, el contratista y el arquitecto son responsables por la ruina del edificio debida a defectos del suelo o de la construcción durante diez años desde la entrega, independientemente de cualquier periodo de garantía contractual — esta es una responsabilidad legal irrenunciable. El Decreto 282 de 2019 regula la póliza de responsabilidad decenal que los constructores residenciales deben obtener bajo la Ley 1796 de 2016.

¿Puede el propietario negarse a suscribir el Acta de Recibo de Obra en Colombia?

El propietario o la entidad contratante puede negarse a suscribir el Acta de Recibo de Obra cuando las obras de construcción no cumplen las especificaciones contractuales, los diseños aprobados o los códigos de construcción aplicables. Bajo el Artículo 4 de la Ley 80 de 1993, la entidad contratante tiene el deber de verificar el cumplimiento del contrato — suscribir un acta por obras deficientes constituiría incumplimiento de esta obligación de supervisión. El interventor es responsable de documentar las deficiencias mediante observaciones escritas y exigir su corrección antes de recomendar la aceptación. Para contratos públicos, la Contraloría General de la República puede investigar responsabilidad disciplinaria y fiscal de los funcionarios que acepten obras deficientes bajo la Ley 610 de 2000. Cuando el contratista considere injustificada la negativa, puede: solicitar arbitraje bajo la cláusula compromisoria del contrato; presentar demanda ante el Juzgado Administrativo o Tribunal Administrativo para contratos públicos bajo la Ley 1437 de 2011; o solicitar conciliación ante la Procuraduría General de la Nación. Para contratos privados, las disputas sobre aceptación se resuelven ante los Juzgados Civiles del Circuito o mediante el mecanismo arbitral pactado en el contrato. El contratista también puede invocar el Artículo 2056 del Código Civil sobre el derecho al pago ante la terminación satisfactoria de la obra.

¿Que papel cumple el interventor en el proceso de recibo de obra en Colombia?

El interventor desempeña un papel central en el proceso de recibo de obra bajo la ley colombiana. Para contratos de obra publica, el Artículo 83 de la Ley 1474 de 2011 ordena la designación de un interventor para todos los contratos que requieran supervisión técnica especializada — el interventor actúa como representante de la entidad contratante responsable de verificar que las obras cumplan las especificaciones contractuales, los diseños aprobados y las normas aplicables. Durante el proceso de aceptación, el interventor realiza inspecciones finales de todas las obras terminadas, comparando las condiciones reales frente a los planos del contrato y las especificaciones técnicas. El interventor elabora un informe detallado que documenta el cumplimiento o identifica las deficiencias pendientes que deben corregirse antes de la aceptación. Bajo el Decreto 1082 de 2015, el interventor recomienda la aceptación a la entidad contratante solo después de confirmar que: todas las obras contratadas estan terminadas; los resultados de los ensayos de calidad cumplen los estándares especificados; el contratista ha cumplido las obligaciones laborales y de seguridad social bajo la Ley 100 de 1993 y el Decreto 1072 de 2015; y todas las observaciones previas de las actas parciales han sido resueltas. El interventor suscribe el Acta de Recibo de Obra conjuntamente con el contratista y el representante de la entidad contratante. Bajo el Artículo 84 de la Ley 1474 de 2011, el interventor enfrenta responsabilidad personal disciplinaria, fiscal y penal por certificar la aceptación de obras deficientes.

¿Como se relaciona el Acta de Recibo de Obra con el permiso de ocupación en Colombia?

El Acta de Recibo de Obra es prerequisito para obtener la autorización de ocupación (permiso de ocupación o certificado de ocupación) de la autoridad de planeación municipal bajo el Decreto 1077 de 2015. El Artículo 2.2.6.1.4.1 del Decreto 1077 establece que ningún edificio puede ser ocupado o usado para su fin previsto hasta que la Curaduría Urbana o la Secretaría de Planeación verifique que la construcción se termino conforme a la licencia de construcción. El tramite requiere la presentación de: el Acta de Recibo de Obra suscrita por el propietario, el contratista y el interventor; la certificación del supervisor técnico que confirma el cumplimiento de la NSR-10 bajo el Artículo 33 de la Ley 400 de 1997; el paz y salvo de obra expedido por la Curaduría; y la certificación de conexión a las redes de servicios públicos (acueducto, alcantarillado, energía eléctrica, gas) por parte de las respectivas empresas de servicios públicos bajo la Ley 142 de 1994. Para proyectos residenciales sujetos a la Ley 1796 de 2016, el certificado de supervisión técnica independiente debe confirmar que la estructura cumple todos los requisitos de sismo resistencia. El Cuerpo de Bomberos municipal puede exigir adicionalmente un concepto de bomberos. Ocupar un edificio sin la autorización debida constituye una infracción urbanística bajo el Artículo 104 de la Ley 388 de 1997, sujeta a multas y posibles ordenes de cierre.

¿Que documentación debe acompañar el Acta de Recibo de Obra en un contrato de obra publica?

Los contratos de obra publica bajo la Ley 80 de 1993 y el Decreto 1082 de 2015 requieren documentación integral que acompañe el Acta de Recibo de Obra para el cierre adecuado del contrato. El interventor debe compilar: un informe final de interventoría que detalle el cumplimiento de todas las especificaciones contractuales y la resolución de las observaciones pendientes de actas parciales anteriores; planos record o planos de obra construida que reflejen la construcción real incluyendo las modificaciones aprobadas; resultados de ensayos de materiales y certificados de control de calidad de laboratorios acreditados por el Organismo Nacional de Acreditación de Colombia (ONAC) bajo el Decreto 1595 de 2015; el certificado de cumplimiento de la NSR-10 del supervisor técnico bajo la Ley 400 de 1997; resumen financiero que concilie el valor original del contrato, las adiciones aprobadas (limitadas al 50% bajo el Artículo 40 de la Ley 80 de 1993) y el valor total ejecutado; paz y salvo del contratista de EPS, AFP, ARL y Cajas de Compensación Familiar bajo la Ley 789 de 2002; certificados de aportes parafiscales verificados mediante informes PILA; evidencia de pólizas de seguros actualizadas — póliza de estabilidad de obra con vigencia de cinco años desde la fecha de aceptación, póliza de calidad del bien y póliza de responsabilidad civil; e informe de cumplimiento del SG-SST bajo el Decreto 1072 de 2015. Los formatos estándar de Colombia Compra Eficiente exigen la carga de toda la documentación en la plataforma SECOP II.

Based on Ley 400 de 1997; Código Civil art. 2060 — text last edited November 2026

This template is provided for informational purposes only and does not constitute legal advice. Laws vary by jurisdiction and change over time. Consult a qualified attorney for advice specific to your situation.Full disclaimer