Safe Work Method Statement — SWMS (Australia)

A Safe Work Method Statement (SWMS) is a legally required document for high risk construction work (HRCW) in Australia.

Key facts

AustraliaAustraliaEnglish (AU)FreePDF & Word
Legal basisFair Work Act 2009 (Cth) source Signature lines in this template: 2 partiesSource verified
Safe Work Method Statement (SWMS)

Safe Work Method Statement — WHS Regulation 2017 Chapter 6 Part 2 (High Risk Construction Work)

High Risk Construction Work — WHS Regulation 2017 (Cth) Chapter 6 Part 2 | WHS Act 2011 ss 17-19

SWMS Reference: [SWMS Title] | Version: [SWMS Version]

Principal Contractor: [Principal Contractor Name] (ABN [Principal Contractor ABN])

Subcontractor (if applicable): [Subcontractor Name]

Project: [Project Name]

Site: [Site Address], [Site City] [Site State] [Site Postcode]

Type of HRCW: [HRCW Type]

Date Prepared: [SWMS Date]

Prepared By: [Prepared By Name], [Prepared By Title]

Approved By: [Principal Contractor Approval Name], [Principal Contractor Approval Title] | Date: [Approval Date]

Site Supervisor: [Site Contact Name]

1. LEGISLATIVE BASIS

This Safe Work Method Statement (SWMS) has been prepared in accordance with the Work Health and Safety Act 2011 (Cth) (WHS Act) and the Work Health and Safety Regulation 2017 (Cth) (WHS Regulation), Chapter 6 Part 2 (Construction Work). Under WHS Regulation reg 291, a SWMS must be prepared before high risk construction work (HRCW) as defined in Schedule 18 of the WHS Regulation commences. The SWMS must: (a) identify the work that is HRCW; (b) specify the hazards and risks associated with the HRCW; (c) describe the measures to be implemented to control the risks; and (d) describe how the control measures are to be implemented, monitored, and reviewed. Under WHS Regulation reg 292, workers must not begin HRCW unless they have been given the opportunity to read and understand the SWMS and have been consulted about the SWMS content. Control measures are implemented in accordance with the WHS hierarchy of controls (WHS Act ss 17-19; WHS Regulation regs 34-38).

2. PROJECT AND WORK DETAILS

2.1 Description of High Risk Construction Work

[Work Description]

2.2 Workers Consulted

The following workers were consulted in the preparation of this SWMS in accordance with WHS Regulation reg 291(2):

[Workers Consulted]

3. LICENCES, PERMITS, AND EMERGENCY PROCEDURES

3.1 High Risk Work Licences Required

[Licences Required]

3.2 Permits and Approvals Required

[Permits Required]

3.3 Emergency Procedures

[Emergency Plan]

4. HAZARD IDENTIFICATION AND RISK ASSESSMENT

Risk Rating Matrix: Likelihood × Consequence = Risk Level. Likelihood: Almost Certain / Likely / Possible / Unlikely / Rare. Consequence: Catastrophic (fatality) / Critical (serious injury, permanent impairment) / Significant (medical treatment) / Minor (first aid) / Negligible. Risk Levels: Extreme (do not proceed without eliminating or reducing to at least High) / High (act urgently) / Medium (act in a reasonable timeframe) / Low (monitor and review).

[Hazard Risk Table]

5. CONTROL MEASURES — HIERARCHY OF CONTROLS

5.1 Fall Prevention and Protection Controls

[Fall Prevention Controls]

5.2 Additional Controls for Other Identified Hazards

[Additional Control Measures]

6. STEP-BY-STEP WORK SEQUENCE

The high risk construction work covered by this SWMS must be performed in accordance with the following step-by-step sequence. Workers must not deviate from this sequence without stopping work and reviewing this SWMS with the site supervisor.

[Work Sequence]

7. MONITORING, REVIEW, AND SWMS REVISION

7.1 Monitoring and Supervision

[Monitoring Arrangements]

7.2 Triggers for SWMS Review and Revision

[Review Triggers]

8. APPROVAL AND WORKER SIGN-ON

8.1 Principal Contractor Approval

This SWMS has been reviewed and approved by the principal contractor.

Name: [Principal Contractor Approval Name]

Title: [Principal Contractor Approval Title]

Date: [Approval Date]

8.2 Worker Acknowledgement

Under WHS Regulation 2017 reg 292, workers must not begin high risk construction work unless they have had the opportunity to read and understand this SWMS and have been consulted about its content. All workers performing the HRCW covered by this SWMS must sign below to confirm they have read, understood, and agree to work in accordance with this SWMS.

Worker Name | Licence No. | Signature | Date

__________________________ | ______________ | __________________ | __________

__________________________ | ______________ | __________________ | __________

__________________________ | ______________ | __________________ | __________

__________________________ | ______________ | __________________ | __________

__________________________ | ______________ | __________________ | __________

This SWMS is prepared by: [Prepared By Name], [Prepared By Title] — [SWMS Date]

This SWMS must be kept at the construction site and available for inspection by any WHS inspector or person who carries out the HRCW under WHS Regulation reg 291(5).

Prepared By (Lead Worker / WHS Coordinator)

________________

Signature

Date: ________________

Approved By (Principal Contractor)

________________

Signature

Date: ________________

What Is a Safe Work Method Statement — SWMS (Australia)?

A Safe Work Method Statement — SWMS in Australia sets the scope of works, price, timeframe, and variation and completion procedures between the principal and the builder or contractor under the Fair Work Act 2009 (Cth).

A SWMS must: identify the work that is high risk construction work (by reference to Schedule 18); specify the hazards relating to the HRCW and the risks to health and safety; describe the measures to be implemented to control the risks; and describe how the control measures are to be implemented, monitored, and reviewed. Control measures must be selected and applied in accordance with the WHS hierarchy of controls (WHS Act 2011 ss 17-19 and WHS Regulation regs 34-38): elimination, substitution, isolation, engineering controls, administrative controls, and PPE.

A SWMS must be prepared before the HRCW commences, in consultation with the workers who will carry out the work. All workers who are to perform the HRCW must be given the opportunity to read and understand the SWMS, and must sign a register confirming their understanding before commencing the work. The SWMS must be kept at the construction site while the HRCW is being carried out and must be available for inspection by any WHS regulator inspector.

The legal framework governing the Safe Work Method Statement — SWMS (Australia) in Australia draws on several key statutes and regulatory bodies. Under the Fair Work Act 2009 (Cth), the Fair Work Commission (FWC) adjudicates workplace disputes. Section 394 of the Fair Work Act 2009 governs unfair dismissal claims. The Fair Work Ombudsman (FWO) enforces compliance with the National Employment Standards (NES). The Privacy Act 1988 (Cth) and Australian Privacy Principles (APPs) govern personal data handling. The Australian Taxation Office (ATO) administers PAYG withholding and superannuation guarantee obligations under the Superannuation Guarantee (Administration) Act 1992. Parties executing a Safe Work Method Statement — SWMS (Australia) in Australia should confirm the document reflects current law, including any amendments enacted since the original drafting date. The Fair Work Act 2009 (Cth) sets the foundational requirements.

When Do You Need a Safe Work Method Statement — SWMS (Australia)?

A SWMS is legally required before any of the 19 categories of high risk construction work listed in Schedule 18 of the WHS Regulation 2017 (Cth) commences. The most common categories requiring a SWMS in Australian construction projects include:

Work at height: any construction work involving a risk of a person falling more than 2 metres — this includes scaffolding, roofing, formwork, crane operations, and work on elevated structures and platforms.

Demolition: demolition of a load-bearing element of a structure, or any demolition work that could affect the structural integrity of an adjacent structure.

Asbestos: any construction work involving the disturbance or removal of asbestos or asbestos-containing materials.

Confined spaces: construction work carried out in a confined space as defined by WHS Regulation reg 66 (including underground chambers, tanks, pits, ducts, and similar enclosed structures).

Trenching and excavation: any construction work involving a trench or shaft more than 1.5 metres deep.

Work near live services: work involving energised electrical installations or services, or work on pressurised gas, chemical, fuel, or refrigerant pipelines.

Tilt-up and precast concrete: erection and placement of precast concrete elements and tilt-up concrete panels.

Mobile plant: work in an area with movement of powered mobile plant (forklifts, excavators, cranes, concrete pumps) that creates a risk to workers in the area.

For each category of HRCW on a project, a separate SWMS may be needed, or one SWMS may cover multiple categories if they are performed as part of the same work activity.

Parties in Australia should prepare a Safe Work Method Statement — SWMS (Australia) proactively rather than waiting for a dispute to arise. Under the Fair Work Act 2009 (Cth), the Fair Work Commission (FWC) adjudicates workplace disputes. Section 394 of the Fair Work Act 2009 governs unfair dismissal claims. The Fair Work Ombudsman (FWO) enforces compliance with the National Employment Standards (NES). The Privacy Act 1988 (Cth) and Australian Privacy Principles (APPs) govern personal data handling. The Australian Taxation Office (ATO) administers PAYG withholding and superannuation guarantee obligations under the Superannuation Guarantee (Administration) Act 1992.

What to Include in Your Safe Work Method Statement — SWMS (Australia)

A compliant Australian SWMS must include the following key elements as required by WHS Regulation 2017 reg 291:

Project and contractor identification: Full legal name and ABN of the principal contractor and (if different) the subcontractor preparing the SWMS; project name and site address; site supervisor details.

SWMS identification: A unique title or reference number and version, to support document control and confirm the correct version is used at the site.

HRCW type identification: Explicit identification of the type(s) of high risk construction work covered by the SWMS, by reference to Schedule 18 of the WHS Regulation.

Work description: A detailed description of the specific HRCW to be performed, including the scope, equipment, materials, and duration.

Worker consultation record: Names and roles of the workers consulted in preparing the SWMS — mandatory under WHS Regulation reg 291(2).

Licences and permits: HRW licence classes required for the HRCW (e.g., scaffolding, rigging, crane operation), any permits or approvals required, and emergency procedures.

Hazard identification and risk assessment: A systematic identification of all hazards associated with the HRCW, with a risk rating for each hazard using a risk matrix.

Control measures — hierarchy of controls: Controls structured from elimination and substitution through isolation and engineering to administrative and PPE.

Step-by-step work sequence: The specific sequence of tasks with the hazards and controls relevant to each step — the operational guide for workers and supervisors.

Monitoring and review: Monitoring and supervision arrangements, and the triggers requiring SWMS review and revision.

Principal contractor approval and worker sign-on: Approval signature from the principal contractor and a sign-on register for all workers performing the HRCW.

Additional compliance elements for a Safe Work Method Statement — SWMS (Australia) used in Australia include: Under the Fair Work Act 2009 (Cth), the Fair Work Commission (FWC) adjudicates workplace disputes. Section 394 of the Fair Work Act 2009 governs unfair dismissal claims. The Fair Work Ombudsman (FWO) enforces compliance with the National Employment Standards (NES). The Privacy Act 1988 (Cth) and Australian Privacy Principles (APPs) govern personal data handling. The Australian Taxation Office (ATO) administers PAYG withholding and superannuation guarantee obligations under the Superannuation Guarantee (Administration) Act 1992.

Sources & Citations

Statutory citations link to the official government text where one is available, otherwise to a free law library named next to the link.

  1. Fair Work Act 2009 (Cth)AU official

Cite this page

CC BY 4.0 · free to cite

Reference this free template in an article, syllabus, or research note:

APA
Forms Legal. (2026). Safe Work Method Statement — SWMS (Australia) [Legal document template]. Forms Legal. https://forms-legal.com/australia/employment/health-safety/safe-work-method-statement-australia
MLA
"Safe Work Method Statement — SWMS (Australia)." Forms Legal, 2026, https://forms-legal.com/australia/employment/health-safety/safe-work-method-statement-australia.
Chicago
Forms Legal. "Safe Work Method Statement — SWMS (Australia)." Forms Legal, 2026. https://forms-legal.com/australia/employment/health-safety/safe-work-method-statement-australia.
BibTeX
@misc{formslegal-safe-work-method-statement-australia,
  author       = {{Forms Legal}},
  title        = {Safe Work Method Statement — SWMS (Australia)},
  year         = {2026},
  howpublished = {\url{https://forms-legal.com/australia/employment/health-safety/safe-work-method-statement-australia}},
  note         = {Free legal document template. Based on Fair Work Act 2009 (Cth)}
}
Wikipedia
{{cite web |title=Safe Work Method Statement — SWMS (Australia) |website=Forms Legal |publisher=Forms Legal |date=2026 |url=https://forms-legal.com/australia/employment/health-safety/safe-work-method-statement-australia}}
RIS
TY  - ELEC
T1  - Safe Work Method Statement — SWMS (Australia)
T2  - Forms Legal
PB  - Forms Legal
PY  - 2026
UR  - https://forms-legal.com/australia/employment/health-safety/safe-work-method-statement-australia
ER  - 
Forms Legal

Frequently Asked Questions

What is a SWMS and when is it legally required in Australia?

A Safe Work Method Statement (SWMS) is a document that describes how high risk construction work (HRCW) will be performed safely. It is legally required under Work Health and Safety Regulation 2017 (Cth) reg 291 for all 19 categories of HRCW listed in Schedule 18 of the WHS Regulation. HRCW includes work involving a risk of falling more than 2 metres, demolition, asbestos work, work in confined spaces, trenching more than 1.5 metres deep, tilt-up concrete, work near energised electrical installations, work involving explosives, tunnelling, and other high-risk construction activities. A SWMS must be prepared before the HRCW commences, must be prepared in consultation with the workers who will carry out the work, must be available at the construction site at all times during the HRCW, and must be reviewed and revised if conditions change. Under reg 292, workers must not begin HRCW unless they have been given the opportunity to read and understand the SWMS.

Who is responsible for ensuring a SWMS is prepared — the principal contractor or the subcontractor?

Both the person who carries out the HRCW and the principal contractor have obligations under the WHS Regulation. Under reg 291, the person who is to carry out the HRCW (which may be the principal contractor or a subcontractor) must prepare the SWMS before the work commences. Under reg 309, the principal contractor must take all reasonable steps to obtain a copy of any SWMS prepared by a subcontractor and require that any HRCW on the project is carried out in accordance with a SWMS. In practice, the subcontractor typically prepares the SWMS for the specific HRCW they will perform, and the principal contractor reviews and approves the SWMS as part of their site management obligations. The principal contractor is also responsible for ensuring that the SWMS is made available to all workers performing the HRCW and that a worker sign-on register is completed before work commences.

Does every worker on a construction site need to read and sign the SWMS?

Under WHS Regulation 2017 reg 292, only workers who are to carry out the specific high risk construction work covered by the SWMS must be given the opportunity to read and understand the SWMS before commencing that work. Other workers on the construction site who are not performing that specific HRCW are not required to sign the SWMS. However, all workers on a construction site generally require a construction induction card (CIC, formerly known as a 'white card') under WHS Regulation reg 317 before they can work on the site. A separate site-specific induction is also typically required by the principal contractor. The SWMS sign-on register serves as evidence that the workers performing the HRCW have been informed of and agreed to work in accordance with the SWMS — it is an important compliance and due diligence record that should be retained after the work is completed.

When must a SWMS be reviewed and revised?

Under WHS Regulation 2017 reg 291(4), the SWMS must be reviewed and if necessary revised before work continues if: (a) the SWMS may no longer minimise the risks to health and safety of persons carrying out the HRCW; (b) a person with management or control of the workplace requests a review; or (c) a work health and safety representative requests a review. In practice, a SWMS should also be reviewed after any incident or near miss involving the HRCW, when there is a significant change in site conditions or weather, when new hazards are identified, when work methods change, or at regular intervals as part of the site's safety management routine. Reviewed and revised versions of the SWMS should be re-dated, version-numbered, and re-signed by the workers performing the HRCW before the revised SWMS is used.

What high risk work licences are required for scaffolding work?

Under WHS Regulation 2017 Chapter 4 and Schedule 3, scaffolding work requires a high risk work (HRW) licence. The licence class depends on the type and height of the scaffold: a Basic Scaffolding licence (class SB) is required for basic scaffolding work up to 4 metres in height; an Intermediate Scaffolding licence (class SI) is required for more complex scaffolding work (including most suspended scaffolding, and cantilever, hung, and spur scaffolds); and an Advanced Scaffolding licence (class SA) is required for the most complex scaffolding configurations including hung, suspended, and mast-climber scaffolding. HRW licences are issued by the state and territory WHS regulators. A person must hold the required licence before performing the relevant scaffolding work, and the principal contractor must verify the licence before the worker commences the HRCW. Licences can be verified through the state regulator's online licence register.

What are the principal contractor's obligations for construction sites where HRCW is performed?

Under WHS Regulation 2017, the principal contractor for a construction project where construction work costs more than $250,000 has extensive obligations, including: preparing a WHS management plan for the project (reg 309) that addresses the management of HRCW; taking all reasonable steps to obtain a copy of each SWMS prepared by any subcontractor performing HRCW on the project (reg 309); ensuring HRCW is not carried out unless a SWMS is in place; ensuring that the site is notified to the WHS regulator if the project involves notifiable construction work (cost above $250,000) before construction work begins (reg 291A); ensuring that all workers hold the required HRW licences before commencing HRCW; and requiring a construction induction card (CIC) from all workers before they enter the site. The principal contractor is also a PCBU with all the general duties under WHS Act ss 19-27, including officer due diligence obligations.

Based on Fair Work Act 2009 (Cth) — text last edited October 2026Verify the source →

This template is provided for informational purposes only and does not constitute legal advice. Laws vary by jurisdiction and change over time. Consult a qualified attorney for advice specific to your situation.Full disclaimer

Found an error? Let us know

Related Documents

You may also find these documents useful:

WHS Risk Assessment (Australia)

An Australian WHS Risk Assessment is a systematic process for identifying hazards in a workplace, evaluating the likelihood and consequence of harm, and determining and documenting the control measures needed to protect workers and other persons. It is a core requirement of the work health and safety management system for every Australian workplace and is mandated by the Work Health and Safety Act 2011 (Cth) and the Work Health and Safety Regulation 2017 (Cth). The legal obligation to conduct WHS risk assessments arises from the primary duty of care in WHS Act 2011 s 19, which requires the person conducting a business or undertaking (PCBU) to ensure, so far as is reasonably practicable, the health and safety of workers and other persons at the workplace. This broad duty encompasses the identification and management of all reasonably foreseeable hazards. The specific risk management process is set out in WHS Regulation 2017 Part 3.1, which requires the PCBU to: identify reasonably foreseeable hazards (reg 34); eliminate risks so far as is reasonably practicable, or — if elimination is not reasonably practicable — minimise risks so far as is reasonably practicable (reg 35); select and implement control measures using the hierarchy of controls (reg 36); maintain and review control measures (regs 37-38); and identify any duty to consult (WHS Act s 47-49). The hierarchy of controls established by WHS Act ss 17-19 and WHS Regulation regs 34-38 requires the PCBU to work through levels of control in order of decreasing effectiveness and reliability: (1) Elimination — removing the hazard entirely from the workplace is the most effective control and should always be considered first; (2) Substitution — replacing the hazardous thing, substance, or work practice with something less hazardous; (3) Isolation — physically separating workers from the hazard using barriers, enclosures, or remote operation; (4) Engineering controls — modifying equipment, plant, or the work environment to reduce the hazard (guards, ventilation, noise enclosures); (5) Administrative controls — implementing safe work procedures, training, supervision, job rotation, signage, and permits to work; (6) Personal protective equipment (PPE) — provided as a last resort or to supplement higher-order controls, and always provided free of charge to workers under WHS Regulation reg 44. Under WHS Act 2011 s 47, the PCBU must, so far as is reasonably practicable, consult workers who are (or are likely to be) directly affected by a matter relating to work health and safety, including during the hazard identification and risk management process. Health and safety representatives (HSRs) elected under WHS Act Part 5 have specific rights to participate in and be consulted about WHS risk management, including the right to inspect the workplace and review WHS documentation. Failure to consult workers is itself a breach of the WHS Act. Under WHS Act 2011 s 27, officers of the PCBU (directors, senior executives) have a personal positive duty to exercise due diligence to ensure the organisation complies with the WHS Act and Regulation. A documented, regularly reviewed risk assessment is a key mechanism for demonstrating officer due diligence under this provision. Officers can be held personally liable for failures of due diligence, with fines of up to $600,000 for Category 2 offences under the WHS Act. Specific hazard categories have additional WHS Regulation requirements: noise exposure above 85 dB(A) triggers the audiometric testing and hearing protection obligations in WHS Regulation regs 55-60; hazardous chemicals trigger the SDS, labelling, health monitoring, and risk assessment requirements in WHS Regulation Chapter 7; hazardous manual tasks trigger the specific risk assessment obligation in WHS Regulation regs 59-64; and work at heights above 2 metres (in construction) triggers the fall prevention obligations in WHS Regulation Chapter 6. This WHS Risk Assessment template covers all key elements required by the WHS Act and Regulation, including organisation details, assessment scope and methodology, worker consultation records, comprehensive hazard identification across physical, chemical, ergonomic, and psychosocial categories, risk evaluation using a risk matrix, control measures structured according to the full hierarchy of controls, residual risk re-assessment, an implementation plan with priority actions and responsible persons, and sign-off by the assessor and approving manager.

Workplace Incident Report Form (Australia)

An Australian Workplace Incident Report Form is a structured document used to record the details of a workplace incident, including accidents, injuries, illnesses, dangerous incidents, and near misses. It is an essential component of a workplace's work health and safety (WHS) management system and is required under Australian WHS legislation for the investigation of workplace hazards and the notification of notifiable incidents to WHS regulators. The primary legislative obligation to report and investigate workplace incidents arises from the Work Health and Safety Act 2011 (Cth) (WHS Act) and its state and territory equivalents. Under s 38 of the WHS Act, the person conducting a business or undertaking (PCBU) must notify the WHS regulator immediately — by the fastest possible means — after becoming aware that a notifiable incident arising from the conduct of the business or undertaking has occurred at a workplace. A notifiable incident is defined in the WHS Act as: (a) the death of a person; (b) a serious injury or illness of a person (as defined in s 36, which includes injuries requiring immediate in-patient hospital treatment, amputations, serious head and eye injuries, burns, certain diseases, and other serious harm); or (c) a dangerous incident (as defined in s 37, which includes incidents involving uncontrolled explosions, fires, escapes of hazardous substances, and structural collapses). Under WHS Act s 39, the PCBU must ensure that the site of a notifiable incident is not disturbed until an inspector arrives or the WHS regulator gives permission, except to the extent necessary to assist injured persons, remove a deceased person, prevent a further incident, or as required by another law. The PCBU must also keep a record of each notifiable incident for at least five years from the day the regulator is notified, as required by WHS Regulation 2017 (Cth) reg 693. Beyond notifiable incidents, best practice WHS management — consistent with Part 3.1 of the WHS Regulation — requires the PCBU to identify hazards, assess risks, and implement controls using the hierarchy of controls for all workplace incidents and near misses, not just notifiable ones. A near miss investigation may reveal systemic failures that could result in a serious injury or death if not corrected, and the WHS Regulation's risk management obligations apply to all workplace hazards regardless of whether an injury has occurred. State and territory workers compensation legislation also imposes reporting obligations on employers when a worker sustains a work-related injury or illness. Under the Workers Compensation Act 1987 (NSW), the Accident Compensation Act 1985 (Vic), the Workers' Compensation and Injury Management Act 1981 (WA), the Workers' Compensation and Rehabilitation Act 2003 (Qld), and equivalent legislation in other states and territories, employers must notify their workers compensation insurer of a work-related injury within a prescribed timeframe (typically 48 hours for serious injuries and five days for other injuries, depending on the jurisdiction). A completed incident report form is a key document in the workers compensation claims process. Effective incident investigation requires identification of contributing factors at multiple levels: the immediate (direct) causes — the physical events or conditions that directly caused the harm; the underlying (systemic) causes — the failures in systems, processes, supervision, training, or equipment; and the root causes — the fundamental organisational or management failures that allowed the other causes to develop. This multi-level analysis is essential for identifying corrective actions that will be effective in preventing recurrence, as opposed to focusing only on the visible, immediate cause. This Workplace Incident Report Form template covers all key elements required for an effective incident report, including full details of the incident, the persons involved and their employment status, the nature of injury or harm, witness details, notifiable incident assessment and regulator notification records, immediate actions taken, contributing factor and root cause analysis, corrective actions prioritised using the hierarchy of controls, and management sign-off. It is suitable for use by employers and PCBUs across all industries in all Australian states and territories.

Manual Task Risk Assessment (Australia)

An Australian Manual Task Risk Assessment is a systematic document used to identify the hazardous manual task risk factors present in a specific work task, evaluate the level of risk of musculoskeletal disorder, and determine the control measures required to eliminate or minimise that risk. It is required by Australian work health and safety legislation and is a key tool for protecting workers from one of the most common causes of workplace injury in Australia. Manual handling injuries — particularly musculoskeletal disorders (MSDs) affecting the back, shoulder, neck, and upper limbs — are consistently among the most common and costly workplace injuries in Australia. Safe Work Australia data shows that manual handling is a leading mechanism of workplace injury, accounting for a substantial proportion of all serious workers' compensation claims each year. This makes systematic identification and control of hazardous manual tasks a high-priority WHS obligation for all employers. The legislative framework governing hazardous manual tasks in Australia is primarily established by regulations 60 to 68 of the Work Health and Safety Regulation 2017 (Cth) (WHS Regulation), made under the Work Health and Safety Act 2011 (Cth) (WHS Act). Regulation 60 defines a 'hazardous manual task' as a task that requires a person to use force exerted by a person, repetitive or sustained force, high or sudden force, repetitive movement, sustained or awkward posture, or exposure to vibration. Under reg 61 of the WHS Regulation, the person conducting a business or undertaking (PCBU) must identify the risk factors for musculoskeletal disorder associated with each hazardous manual task performed by a worker. Under reg 62, the PCBU must eliminate the risk of musculoskeletal disorder if reasonably practicable; if elimination is not reasonably practicable, the PCBU must minimise the risk so far as is reasonably practicable by implementing controls using the hierarchy of controls: elimination, substitution, isolation, engineering controls, administrative controls, and personal protective equipment. Regulation 65 requires the PCBU to review and revise risk control measures when the risk may have changed or when controls are not effective. The Safe Work Australia Code of Practice: Hazardous Manual Tasks (the Code) is approved under s 274 of the WHS Act and provides detailed practical guidance on identifying, assessing, and controlling hazardous manual task risks. The Code is admissible in WHS proceedings as evidence of what is known about hazards or risks and standards of risk management. Following the Code is the most straightforward way for a PCBU to demonstrate compliance with the WHS Regulation requirements for hazardous manual tasks. The Code identifies the key biomechanical risk factors associated with musculoskeletal disorder: forceful exertions (lifting, pushing, pulling, carrying heavy loads); repetitive or sustained movements (repeated actions, prolonged sustained postures); awkward or sustained postures (bending, twisting, reaching, overhead work, kneeling); vibration (whole-body vibration from vehicles, hand-arm vibration from power tools); and the physical characteristics of objects handled (heavy, large, unstable, difficult to grip). The presence of multiple risk factors significantly increases the probability of musculoskeletal injury. The Code also emphasises the importance of consulting workers when identifying hazards and developing control measures. Workers who perform the task often have valuable practical knowledge about the physical demands and risk factors involved, and their input is essential for developing effective and workable controls. Consultation is also a legal obligation under Part 5 of the WHS Act. Effective control of hazardous manual tasks typically involves a combination of engineering controls (mechanical aids such as hoists, trolleys, pallet jacks, conveyor systems, or height-adjustable workstations), administrative controls (job rotation, task scheduling, limiting duration of high-risk tasks, safe work procedures, training in manual handling techniques, and health monitoring), and personal protective equipment (safety footwear, gloves) as a supplementary measure. This Manual Task Risk Assessment template covers all requirements of regs 60–68 of the WHS Regulation 2017 (Cth) and the Safe Work Australia Code of Practice: Hazardous Manual Tasks, including task description, identification of all five categories of manual task risk factors, assessment of existing controls, overall risk rating, injury history, control measures across the full hierarchy, an action plan with responsibilities and timeframes, worker consultation, and sign-off. It is suitable for all industries and workplaces across Australia.