Environmental Impact Assessment Declaration (Pakistan)
ENVIRONMENTAL IMPACT ASSESSMENT DECLARATION
Submitted under Section 12 of the Pakistan Environmental Protection Act 1997
Environmental Impact Assessment Regulations 2000 (S.R.O. 339(I)/2000)
Submitted to: [Receiving EPA]
Date of Submission: [Declaration Date]
City: [Declaration City]
PART A: PROJECT PROPONENT DETAILS
Proponent Name: [Proponent Name]
Registered Address: [Proponent Address]
Designated Environmental Manager: [Environmental Manager]
Preparing Environmental Consultant: [Consultant Name]
PART B: PROJECT DESCRIPTION
Project Name: [Project Name]
Project Type / Category: [Project Type]
Assessment Type: [Assessment Type]
Project Location: [Project Location]
Estimated Capital Cost: [Project Cost]
Construction Timeline: [Construction Timeline]
Operational Life: [Operational Life]
PART C: SIGNIFICANT ENVIRONMENTAL IMPACTS
[Significant Impacts]
PART D: MITIGATION MEASURES
[Mitigation Measures]
A full Environmental Management Plan (EMP) specifying mitigation, monitoring frequency, responsible personnel, and budget allocation is attached to this Declaration as Annexure A. The proponent commits to implement the EMP in its entirety as a condition of project commencement. The EMP will be monitored by [Environmental Manager] and reported to [Receiving EPA] on a quarterly basis.
PART E: NATIONAL ENVIRONMENTAL QUALITY STANDARDS (NEQS) COMPLIANCE
The proponent confirms that all operational emissions and discharges shall comply with the National Environmental Quality Standards (NEQS) issued under Section 6 of the Pakistan Environmental Protection Act 1997, including NEQS for industrial wastewater effluent, ambient air quality, and noise. A monitoring plan showing how NEQS compliance will be measured and reported to [Receiving EPA] is included in the Environmental Management Plan.
PART F: DECLARATION AND CERTIFICATION
I / We, the undersigned, being the authorised representative(s) of [Proponent Name], do hereby solemnly declare that:
1. The information contained in this Environmental Impact Assessment Declaration is accurate, complete, and not misleading.
2. The project described will not commence construction or operation until approval has been received from [Receiving EPA] under Section 12 of the Pakistan Environmental Protection Act 1997.
3. The proponent commits to fully implement the Environmental Management Plan (EMP) attached hereto and to comply with all conditions attached to any EIA approval issued by [Receiving EPA].
4. The proponent acknowledges that false or misleading information in this Declaration constitutes an offence under Section 23 of the Pakistan Environmental Protection Act 1997, punishable by imprisonment up to two years and a fine up to PKR 100,000, and that violation of EIA conditions may result in penalties up to PKR 1 million per day under Section 17 of PEPA 1997.
Signed at [Declaration City] on [Declaration Date].
PROJECT PROPONENT: [Proponent Name]
Authorised Signatory: _________________________
Name & Designation: _________________________
Official Stamp: _________________________
ENVIRONMENTAL CONSULTANT: [Consultant Name]
Consultant Signature: _________________________
EPA Panel Registration No.: _________________________
Date: _________________________
Project Proponent (Authorised Signatory)
________________
Signature
Environmental Consultant
________________
Signature
What Is a Environmental Impact Assessment Declaration (Pakistan)?
An Environmental Impact Assessment Declaration in Pakistan sets down the declarant's affirmation of the facts or intentions described, for reliance by the relevant parties.
PEPA 1997 was enacted to provide for the protection, conservation, rehabilitation, and improvement of the environment, the prevention and control of pollution, and the promotion of sustainable development in Pakistan. Section 12 of PEPA 1997 establishes the core environmental screening and assessment regime: no person shall commence construction or operation of a project without first filing an Initial Environmental Examination (IEE) or, for more significant projects listed in Schedule II of the Environmental Impact Assessment Regulations 2000, a full Environmental Impact Assessment (EIA). The distinction between IEE and full EIA depends on the nature and scale of the project — Schedule I projects require IEE; Schedule II projects require EIA. Industrial projects including textile mills, chemical plants, cement factories, and hydropower installations categorically require full EIA approval from Pak-EPA or the relevant provincial EPA before ground can be broken.
Following the 18th Constitutional Amendment 2010, environmental regulation in Pakistan was substantially devolved to the provinces. Punjab established the Punjab Environmental Protection Agency (PEPA) under the Punjab Environmental Protection Act 1997 (as amended). Sindh operates the Sindh Environmental Protection Agency (SEPA) under the Sindh Environmental Protection Act 2014. Khyber Pakhtunkhwa has the KPK Environmental Protection Agency under the KPK Environmental Protection Act 2014. Balochistan operates its EPA under the Balochistan Environmental Protection Act 2012. Projects located within the Islamabad Capital Territory (ICT) fall under federal Pak-EPA jurisdiction. Inter-provincial and federal infrastructure projects — dams, highways, inter-provincial pipelines — require federal Pak-EPA approval in addition to relevant provincial clearances.
The National Environmental Quality Standards (NEQS) issued by the Federal Government under Section 6 of PEPA 1997 set binding numerical limits on pollutant discharges into air, water, and land — for example, NEQS for industrial wastewater effluent, ambient air quality, and noise levels. The EIA declaration must demonstrate that the project's operational emissions and discharges will comply with applicable NEQS, and must include a monitoring plan specifying how compliance will be measured and reported to the relevant EPA. Pak-EPA and provincial EPAs have power under Section 17 of PEPA 1997 to order closure, seal premises, and impose fines of up to PKR 1 million per day for violations of NEQS or conditions attached to EIA approvals.
Pakistan's EIA regime has been strengthened in recent years under the China-Pakistan Economic Corridor (CPEC) infrastructure program — major CPEC projects including the Gwadar Port expansion, the ML-1 Railway upgrade, and the Karakoram Highway improvements require environmental clearances under both Pakistani law and applicable international environmental standards of the Asian Development Bank (ADB), World Bank, and China's Ministry of Commerce Environmental Guidelines for Foreign Investment Cooperation.
When Do You Need a Environmental Impact Assessment Declaration (Pakistan)?
An Environmental Impact Assessment Declaration in Pakistan is required whenever a project proponent proposes to commence construction or operation of a project that falls within the categories specified in Schedules I or II of the Environmental Impact Assessment Regulations 2000 under PEPA 1997.
An EIA Declaration is required for all industrial projects — including manufacturing plants, chemical factories, cement works, textile mills, tanneries, sugar mills, and food processing facilities — that will discharge effluents into water bodies, emit air pollutants, or generate hazardous waste regulated under the Hazardous Substances Rules 2003 promulgated under PEPA 1997.
An EIA Declaration is needed for infrastructure projects — including roads, bridges, pipelines, power transmission lines, airports, seaports, and dams — that affect natural habitats, forest reserves notified under the Forest Act 1927, protected wildlife sanctuaries under the Wildlife Protection Acts of the respective provinces, or coastal areas regulated under the Sindh Coastal Area Development Authority Act.
An EIA Declaration is required for real estate and urban development projects — including housing schemes, commercial plazas, and hotel developments — above the size thresholds specified in Schedule I of the EIA Regulations 2000. The Capital Development Authority (CDA) in Islamabad and the Lahore Development Authority (LDA) in Punjab require EIA or IEE clearance before approving building plans for large developments.
An EIA Declaration is needed for mining and extraction projects — coal mining in Balochistan and KPK, natural gas extraction, oil exploration, and mineral quarrying — which require environmental approval from Pak-EPA in addition to mining leases from the relevant provincial mining department or the Petroleum Division.
An EIA Declaration is required for energy projects — including thermal power plants, wind farms in Sindh and Balochistan, solar photovoltaic installations above threshold capacity, and run-of-river hydro projects in KPK and AJK — under the National Electric Power Regulatory Authority (NEPRA) licensing framework, which conditions generation licences on environmental clearance from the relevant EPA.
Parties in Pakistan should prepare a Environmental Impact Assessment Declaration (Pakistan) proactively rather than waiting for a dispute to arise. Courts interpret agreements based on the written terms rather than oral representations. Under Pakistani law, the Constitution of Pakistan 1973 is the supreme law. The Contract Act 1872 governs contractual obligations. The Federal Board of Revenue (FBR) administers tax under the Income Tax Ordinance 2001. The High Courts have original and appellate jurisdiction. The National Database and Registration Authority (NADRA) handles identity documentation. The Federal Shariat Court reviews laws for Islamic compliance. Where the transaction involves regulated activities, prior approval from the relevant authority may be required before execution.
What to Include in Your Environmental Impact Assessment Declaration (Pakistan)
A complete Environmental Impact Assessment Declaration in Pakistan under PEPA 1997 and the EIA Regulations 2000 must contain the following essential elements to be accepted by Pak-EPA or the relevant provincial EPA for review and approval.
Project Description: A detailed description of the proposed project — its nature, purpose, scale, location (GPS coordinates, province, district, tehsil, mauza), estimated capital cost, construction timeline, and operational life. The description must identify the project category under Schedules I or II of the EIA Regulations 2000 and confirm whether an IEE or full EIA is required. Projects near the Indus River system, wetlands, or protected forests in Khyber Pakhtunkhwa require special mention of proximity to sensitive ecosystems.
Proponent Information: Full legal name of the project proponent (individual or company), CNIC or SECP registration number, registered address, and contact details of the designated Environmental Manager responsible for compliance. For companies incorporated under the Companies Act 2017, the SECP registration number and the name of the chief executive officer must be provided.
Baseline Environmental Data: A scientific description of the existing environmental conditions at the project site and surrounding area — including air quality measurements against NEQS, water quality of nearby watercourses, soil quality, noise levels, biodiversity survey results (flora and fauna), demographic data of nearby communities, and existing land use. This baseline data must be collected by a qualified environmental consultant registered with Pak-EPA or the relevant provincial EPA's panel of approved consultants.
Impact Assessment: A systematic analysis of the significant adverse environmental impacts likely to result from the project — during construction, operation, and decommissioning phases. Impacts must be assessed across: air quality (particulate matter PM10, PM2.5, SO2, NOx emissions against NEQS); water quality (effluent discharges against NEQS for wastewater); noise (construction and operational noise against NEQS for noise); land and soil (waste generation, hazardous waste under the Hazardous Substances Rules 2003); biodiversity; and socio-economic impacts on local communities.
Environmental Management Plan (EMP): A detailed mitigation, monitoring, and management plan specifying: the measures to be implemented to prevent or minimise each identified adverse impact; the pollution control technologies to be installed (effluent treatment plants, electrostatic precipitators, noise barriers); the monitoring frequency and parameters; the responsible personnel; and the budget allocated to environmental management. The EMP is a legally binding commitment — Pak-EPA and provincial EPAs attach the EMP as a condition of the EIA approval order, and violations trigger penalties under Section 17 of PEPA 1997.
Public Consultation Record: Evidence that affected communities have been informed about the proposed project and given an opportunity to raise concerns, consistent with the public hearing requirements under the EIA Regulations 2000. Pak-EPA and provincial EPAs may require a formal public hearing for large or controversial projects — the minutes of the public hearing must be appended to the EIA declaration.
Declaration and Certification: A signed declaration by the project proponent — and countersigned by the qualified environmental consultant — confirming that the information in the EIA is accurate and complete, and that the proponent commits to implement the Environmental Management Plan as a condition of commencing the project. False or misleading information in an EIA declaration constitutes an offence under Section 23 of PEPA 1997, punishable by imprisonment up to two years and a fine up to PKR 100,000.
Forms-legal.com provides this Environmental Impact Assessment Declaration (Pakistan) template as a starting framework for project proponents preparing EIA submissions. The template reflects the requirements of PEPA 1997, the EIA Regulations 2000, and the NEQS. All EIA submissions must be prepared with the assistance of a qualified environmental consultant registered with the relevant EPA — project proponents should engage a consultant early in the project design phase to confirm environmental considerations are integrated from the outset.
Under Pakistani law, the Constitution of Pakistan 1973 is the supreme law. The Contract Act 1872 governs contractual obligations. The Federal Board of Revenue (FBR) administers tax under the Income Tax Ordinance 2001. The High Courts have original and appellate jurisdiction. The National Database and Registration Authority (NADRA) handles identity documentation. The Federal Shariat Court reviews laws for Islamic compliance.
Cite this page
Reference this free template in an article, syllabus, or research note:
Forms Legal. (2026). Environmental Impact Assessment Declaration (Pakistan) (Pakistan) [Legal document template]. Forms Legal. https://forms-legal.com/pakistan/government/declarations/environmental-impact-assessment-declaration-pakistan
"Environmental Impact Assessment Declaration (Pakistan) (Pakistan)." Forms Legal, 2026, https://forms-legal.com/pakistan/government/declarations/environmental-impact-assessment-declaration-pakistan.
@misc{formslegal-environmental-impact-assessment-declaration-pakistan,
author = {{Forms Legal}},
title = {Environmental Impact Assessment Declaration (Pakistan) (Pakistan)},
year = {2026},
howpublished = {\url{https://forms-legal.com/pakistan/government/declarations/environmental-impact-assessment-declaration-pakistan}},
note = {Free legal document template}
}Frequently Asked Questions
Under the Pakistan Environmental Protection Act 1997 (PEPA 1997) and the Environmental Impact Assessment Regulations 2000, Pakistan has a two-tier environmental assessment system. An Initial Environmental Examination (IEE) is required for projects listed in Schedule I of the EIA Regulations 2000 — smaller-scale projects with potentially moderate environmental impacts, such as small industrial units, residential developments above a certain size, and commercial facilities. An IEE is a less detailed document that describes the project, identifies significant environmental issues, and proposes mitigation measures. A full Environmental Impact Assessment (EIA) is required for major projects listed in Schedule II — large industrial facilities, infrastructure projects, energy installations, and mining operations — where significant adverse environmental impacts are anticipated. An EIA requires comprehensive baseline environmental surveys, detailed impact modelling, an Environmental Management Plan, and in many cases a formal public hearing. The relevant EPA reviews the EIA submission and issues an approval with conditions, or rejects the application with reasons.
Following the 18th Constitutional Amendment 2010, environmental approval authority in Pakistan is divided between federal and provincial EPAs. The federal Pakistan Environmental Protection Agency (Pak-EPA), operating under the Ministry of Climate Change and Environmental Coordination, approves EIAs for projects located in the Islamabad Capital Territory (ICT), projects with inter-provincial impacts, federal infrastructure projects (CPEC-related projects, national highways, federal power projects), and Azad Jammu and Kashmir (AJK) projects. The Punjab Environmental Protection Agency (Punjab EPA) approves EIAs for projects in Punjab. The Sindh Environmental Protection Agency (SEPA) approves EIAs in Sindh. The KPK Environmental Protection Agency approves EIAs in Khyber Pakhtunkhwa. The Balochistan Environmental Protection Agency approves EIAs in Balochistan. Gilgit-Baltistan (GB) has its own EPA. Projects straddling provincial boundaries or with impacts on multiple provinces require consultation between the relevant EPAs.
Under the Environmental Impact Assessment Regulations 2000, the relevant EPA is required to review and decide on an EIA application within 90 days of receipt of a complete application. In practice, EIA approvals in Pakistan frequently take longer — between six months and two years for complex large-scale projects — due to incomplete applications requiring additional information, public hearing requirements, inter-departmental consultations (with provincial irrigation departments for water use, forest departments for forest clearing, and the Geological Survey of Pakistan for mineral extraction), and capacity constraints at provincial EPAs. Projects in the priority categories of the National Environmental Policy 2005 and CPEC infrastructure projects receive expedited review under the CPEC Environmental and Social Management Framework. Project proponents are strongly advised to engage an EPA-registered environmental consultant early in the project design phase, to conduct baseline surveys during the feasibility study, and to submit complete, high-quality EIA documents to minimise review time.
Commencing construction or operation of a project that requires EIA or IEE approval without obtaining such approval is a serious offence under Section 17 of the Pakistan Environmental Protection Act 1997 (PEPA 1997). The penalties include: a fine of up to PKR 1 million for the first offence; a fine of up to PKR 1 million per day for continuing violations; imprisonment of up to two years for wilful violations; and an order by the Environmental Tribunal (established under Section 20 of PEPA 1997) requiring the project to be closed, sealed, or demolished. Environmental Tribunals have exercised their powers to seal industrial units operating without EIA approval in Punjab, Sindh, and KPK. The National Environmental Quality Standards (NEQS) violations may additionally attract prosecution under the environmental pollution provisions of PEPA 1997. Convictions are recorded by SECP and may affect the company's ability to obtain future regulatory approvals from Pak-EPA, provincial EPAs, NEPRA, OGRA, or other regulatory bodies.
Yes, for housing projects above the size thresholds specified in Schedule I of the Environmental Impact Assessment Regulations 2000. The exact threshold varies by province — generally, residential developments exceeding 50 kanal (approximately 6.25 acres) in area, or those involving significant earthworks, tree felling in protected forests, or discharge of construction wastewater, require at minimum an Initial Environmental Examination (IEE). The Capital Development Authority (CDA) in Islamabad, the Lahore Development Authority (LDA), the Karachi Development Authority (KDA), and other urban development authorities have integrated EIA/IEE requirements into their project approval processes — building plans for large residential schemes cannot be approved without an EIA clearance certificate from the relevant EPA. The Housing Sector Review conducted by the Ministry of Housing and Works has emphasised the need for environmental compliance in the Prime Minister's Affordable Housing Programme projects, requiring EPA clearance for Naya Pakistan Housing Authority (NPHA) projects.
Under the Pakistan Environmental Protection Act 1997 and the EIA Regulations 2000, Environmental Impact Assessment reports must be prepared by qualified environmental consultants with the technical expertise to conduct baseline surveys, impact modelling, and Environmental Management Plan development. Pak-EPA and provincial EPAs maintain panels of registered environmental consultants who have demonstrated the required qualifications — typically an advanced degree in environmental science, engineering, or a related field, plus professional experience in EIA preparation. While the regulations do not prohibit project proponents from preparing their own EIA, in practice all credible EIA submissions accepted by Pakistani EPAs are prepared by professional environmental consultants. The Pakistan Environmental Consultants Association (PECA) represents registered environmental consultants. For large international projects — particularly CPEC infrastructure — international environmental consulting firms (including ERM, Ramboll, and Golder Associates) with local Pakistani partners have been engaged, and their submissions must comply with both PEPA 1997 requirements and applicable international standards of the ADB or World Bank Environmental and Social Framework.
This template is provided for informational purposes only and does not constitute legal advice. Laws vary by jurisdiction and change over time. Consult a qualified attorney for advice specific to your situation.Full disclaimer
Found an error? Let us knowRelated Documents
You may also find these documents useful:
Advance Tax Declaration (Pakistan)
An Advance Tax Declaration for Pakistan — a formal declaration submitted to the Federal Board of Revenue (FBR) confirming estimated income and advance tax payments under the Income Tax Ordinance 2001, Sections 147 and 237.
Cantonment Board NOC Application (Pakistan)
A Cantonment Board NOC Application for Pakistan — a formal No Objection Certificate request to the Cantonment Board for construction, trade, or activity approvals within cantonment limits, governed by the Cantonments Act 2018 and Military Lands and Cantonments Rules.
CDA Sector Plot Application (Pakistan)
A CDA Sector Plot Application for Pakistan — a formal application to the Capital Development Authority for allotment of a residential or commercial plot in an Islamabad sector, governed by the Capital Development Authority Ordinance 1960 and CDA Allotment Regulations.
Completion Certificate Application (Pakistan)
A Completion Certificate Application for Pakistan — a formal request to the Building Control Authority or local development authority confirming that a constructed building complies with approved plans, building bye-laws, and safety standards under the Building Control Authority Ordinance and provincial building regulations.
Cooperative Society Application (Pakistan)
A Cooperative Society Application for Pakistan — a formal application to register a cooperative society under the Cooperative Societies Act 1925, submitted to the provincial Registrar of Cooperative Societies for housing, agricultural, consumer, or credit cooperative purposes.