title: "Maintenance Agreement"
url: "https://forms-legal.com/kenya/business/services/ke-maintenance-agreement"
description: "A Maintenance Agreement in Kenya is a legally binding service contract governed by the Law of Contract Act Cap. 23 under which a service provider (the contractor) agrees to provide ongoing maintenance, repair, inspection, or support services to a client in respect of specified equipment, facilities, or systems, in"
language: "en"
jurisdiction: "Kenya"
category: "Business / Service Contracts"
primaryStatute: "Law of Contract Act Cap. 23"
dateModified: "2026-11-01"
maintainer: "Vladislav Sergienko, founder (not a lawyer)"
---

# Maintenance Agreement

- Kenya · Business / Service Contracts
- Legal basis: Law of Contract Act Cap. 23

## What Is a Maintenance Agreement?

A Maintenance Agreement in Kenya is a legally binding service contract governed by the Law of Contract Act Cap. 23 under which a service provider (the contractor) agrees to provide ongoing maintenance, repair, inspection, or support services to a client in respect of specified equipment, facilities, or systems, in exchange for a periodic fee. The agreement records the scope of maintenance services, the frequency of scheduled maintenance visits, response time commitments for emergency call-outs, parts and labour arrangements, service level standards, and the consequences of non-performance.

The Law of Contract Act Cap. 23 provides the essential legal framework for all service contracts in Kenya, requiring valid offer and acceptance, lawful consideration, legal capacity of the parties, and lawful purpose. A Maintenance Agreement, once signed, is an enforceable contract under which either party may seek damages, specific performance, or other remedies in the Kenyan courts in the event of a breach.

Maintenance agreements are used across a wide range of industries in Kenya. Building owners and property managers in Nairobi, Mombasa, Kisumu, Nakuru, and Eldoret enter into maintenance contracts with facilities management companies for the upkeep of lifts, escalators, air conditioning systems, fire safety equipment, standby generators, plumbing and electrical infrastructure, and CCTV systems. The National Construction Authority, established under the National Construction Authority Act No. 41 of 2011, regulates contractors involved in construction and maintenance works and requires them to be registered before undertaking works above certain thresholds.

Manufacturers and distributors of industrial equipment enter into maintenance agreements with their Kenyan customers to confirm the continued operation of production machinery, agricultural equipment, medical devices regulated under the Medical Devices Regulations issued under the Pharmacy and Poisons Act Cap. 244, and information technology infrastructure. IT maintenance agreements commonly cover server hardware, network equipment, and software support, operating alongside software licence agreements governed by the Copyright Act Cap. 130.

The Employment Act No. 11 of 2007 and the Occupational Safety and Health Act No. 15 of 2007 impose duties on employers to maintain safe working environments, creating compliance-driven demand for professional maintenance agreements covering fire suppression systems certified under the Fire Risk Reduction Rules, 2007, pressure vessels inspected under the Work Injury Benefits Act No. 13 of 2007, and electrical installations inspected under the Energy Act No. 1 of 2019.

The Kenya Maintenance Agreement Maintenance Agreement template is suitable for building maintenance, equipment service contracts, IT support agreements, generator maintenance, and other recurring service arrangements governed by Kenyan law. Under Kenya law, Section 3 of the Companies Act 2015 (No. 17 of 2015) and Section 15 of the Employment Act 2007 (No. 11 of 2007) govern the core requirements for this type of document.

## When Do You Need a Maintenance Agreement?

A Maintenance Agreement is needed in Kenya in any of the following situations.

When a property owner or building manager wishes to engage a facilities management company or specialist contractor for the regular upkeep of building systems — including lifts registered with the Kenya Lifts and Escalators Authority under the Energy and Petroleum Regulatory Authority, air conditioning plant, fire suppression systems, and backup power systems.

When a business purchases capital equipment — agricultural machinery, manufacturing plant, medical devices, commercial refrigeration units, or IT servers — and wishes to contract with the supplier or an authorised service provider for scheduled preventive maintenance and emergency repair services over the equipment's operational life.

When a landlord renting out commercial premises under a lease governed by the Landlord and Tenant (Shops, Hotels and Catering Establishments) Act Cap. 301 or a residential lease wishes to engage a contractor to maintain the property in accordance with their statutory obligations to keep the premises fit for habitation and in good repair.

When a government ministry, county government, state corporation, or public institution wishes to contract for the maintenance of public infrastructure — roads, water systems, public buildings — through a formal maintenance contract procured under the Public Procurement and Asset Disposal Act No. 33 of 2015, which requires written contracts for all procurement above the micro-procurement threshold.

When a hospitality business — hotel, resort, or restaurant — needs ongoing maintenance for kitchen equipment, laundry machinery, or refrigeration systems and wishes to confirm agreed response times for emergency breakdowns that could disrupt guest services and attract liability under the Hotels and Restaurants Act Cap. 494. Under Kenya law, Section 3 of the Companies Act 2015 (No. 17 of 2015) and Section 2 of the Law of Contract Act (Cap 23) govern the core requirements for this type of document.

## What to Include in Your Maintenance Agreement

A thorough Maintenance Agreement in Kenya under the Law of Contract Act Cap. 23 should include the following key elements.

**Parties.** The agreement must identify the service provider (contractor) and the client by full legal name, registration number where applicable, and physical address. Where either party is a company registered under the Companies Act No. 17 of 2015, the company registration number should be stated. Where the contractor carries out works regulated by the National Construction Authority under the National Construction Authority Act No. 41 of 2011, the contractor's NCA registration number and category should be included.

**Scope of Services.** The agreement must define the maintenance services to be provided in sufficient detail. A scheduled maintenance schedule (preventive maintenance) should list the systems or equipment covered, the frequency of inspections and servicing visits, and the specific tasks to be performed at each visit. The scope should distinguish clearly between planned preventive maintenance included in the periodic fee and reactive (emergency) maintenance that may be billed separately or included within agreed call-out allowances.

**Equipment or Facility Description.** The agreement should attach a schedule listing the equipment, systems, or facilities to which the maintenance services apply, including manufacturer, model, serial number, and location. For building systems, the relevant installation permits from the National Construction Authority or the Energy and Petroleum Regulatory Authority should be referenced.

**Service Level Standards.** For each category of maintenance request, the agreement should specify the response time — for example, four hours for critical system failures affecting building safety, 24 hours for non-critical faults. Service levels for uptime guarantees, first-time fix rates, and escalation procedures where the initial technician cannot resolve the issue should be included. Penalties for failure to meet service levels — commonly in the form of service credits — should be stated clearly.

**Fees and Payment.** The periodic maintenance fee — monthly, quarterly, or annual — should be stated in Kenya Shillings (KES). The agreement should specify the payment method (bank transfer, M-Pesa, cheque), the invoice cycle, and the penalty for late payment. Provisions for price adjustments — for example, annual escalation linked to the Kenya National Bureau of Statistics Consumer Price Index — protect the contractor against inflation over the contract term.

**Parts and Materials.** The agreement should specify whether the contractor's fee includes parts and consumables or whether these are billed separately at cost plus an agreed mark-up. The use of original equipment manufacturer (OEM) parts versus compatible aftermarket parts should be addressed, particularly for equipment under manufacturer warranty.

**Liability and Indemnity.** The contractor's liability for damage caused during maintenance works, injury to persons, or third-party property damage should be defined. Both parties should carry appropriate insurance — the contractor should hold public liability insurance and, for works regulated by the National Construction Authority, contractor's all-risks insurance as required under the National Construction Authority (Building and Construction) Regulations.

**Health and Safety.** Maintenance works in Kenya are subject to the Occupational Safety and Health Act No. 15 of 2007. The agreement should require the contractor to comply with applicable health and safety legislation, provide appropriate personal protective equipment to its workers, and comply with any site-specific health and safety rules. The Directorate of Occupational Safety and Health Services (DOSHS) enforces these requirements and inspects workplaces.

**Term and Termination.** The agreement should specify the initial term (commonly one year, renewable annually), the notice period for termination without cause, and grounds for immediate termination including persistent failure to meet service levels and insolvency of the contractor. A transition period should be provided to allow the client to appoint a replacement contractor. Under Kenya law, Section 3 of the Companies Act 2015 (No. 17 of 2015) and Section 15 of the Employment Act 2007 (No. 11 of 2007) govern the core requirements for this type of document.

## Sources & Citations

- [Landlord and Tenant (Shops, Hotels and Catering Establishments) Act Cap. 301](https://kenyalaw.org/akn/ke/act/1965/13)
- [Public Procurement and Asset Disposal Act No. 33 of 2015](https://kenyalaw.org/akn/ke/act/2015/33)
- [National Construction Authority Act No. 41 of 2011](https://kenyalaw.org/akn/ke/act/2011/41)
- [Occupational Safety and Health Act No. 15 of 2007](https://kenyalaw.org/akn/ke/act/2007/15)
- [Work Injury Benefits Act No. 13 of 2007](https://kenyalaw.org/akn/ke/act/2007/13)
- [Law of Contract Act Cap. 23](https://kenyalaw.org/akn/ke/act/1960/43)
- [Employment Act No. 11 of 2007](https://kenyalaw.org/akn/ke/act/2007/11)
- [Companies Act 2015](https://kenyalaw.org/akn/ke/act/2015/17)
- [Copyright Act Cap. 130](https://kenyalaw.org/akn/ke/act/2001/12)
- [Energy Act No. 1 of 2019](https://kenyalaw.org/akn/ke/act/2019/1)

## Frequently Asked Questions

### Is a maintenance agreement legally binding in Kenya without a stamp or notarisation?

Yes. A maintenance agreement is legally binding under the Law of Contract Act Cap. 23 once it is signed by both parties with the required offer, acceptance, consideration, and legal capacity. No stamp, notarisation, or registration is required for a service agreement to be enforceable in Kenya. The Stamp Duty Act Cap. 480 does not impose duty on ordinary service contracts. However, certain instruments — such as deeds or agreements relating to land — require registration or stamping. A maintenance agreement relating to works on land does not require registration unless it creates an interest in land, which a standard service contract does not.

### What remedies does a Kenyan court award for breach of a maintenance agreement?

Kenyan courts applying the Law of Contract Act Cap. 23 and principles of common law can award several remedies for breach of a maintenance agreement. Damages are the primary remedy, measured by the loss caused to the innocent party — for example, the cost of engaging an emergency contractor at premium rates due to the contractor's failure to respond within the agreed time. Specific performance may be ordered where damages are inadequate, though courts are reluctant to order specific performance of ongoing service contracts. The innocent party may also terminate the agreement and claim a refund of advance fees where the breach is fundamental. Service credits agreed in the contract are also enforced as liquidated damages where they represent a genuine pre-estimate of loss.

### Should a maintenance contractor in Kenya be registered with the National Construction Authority?

The National Construction Authority Act No. 41 of 2011 and the NCA (Building and Construction) Regulations require all contractors undertaking building and civil engineering works — including significant mechanical, electrical, and plumbing installation and maintenance — to be registered with the National Construction Authority (NCA) in an appropriate category. Maintenance works involving structural modifications, electrical rewiring, or major mechanical plant replacement are likely to require NCA-registered contractors. Routine preventive maintenance and servicing of equipment without structural or major electrical works may not require NCA registration. Clients should verify the contractor's NCA registration category before signing a maintenance agreement for works that engage the NCA's mandate.

### How does VAT apply to maintenance services in Kenya?

Maintenance services supplied by a VAT-registered contractor in Kenya are subject to Value Added Tax at the standard rate of 16 percent under the Value Added Tax Act No. 35 of 2013. A contractor whose annual taxable turnover exceeds KES 5 million is required to register for VAT with the Kenya Revenue Authority. The maintenance agreement should state whether fees are exclusive or inclusive of VAT. Invoices issued by a VAT-registered contractor must comply with the requirements of the Tax Procedures Act No. 29 of 2015, including the KRA Electronic Tax Register (ETR) requirement for VAT invoices. Clients who are themselves VAT-registered may recover input VAT on maintenance service fees as a credit against their own VAT liability.

### Can a maintenance agreement be terminated early in Kenya?

Early termination of a maintenance agreement is governed by the termination provisions in the contract and the general principles of the Law of Contract Act Cap. 23. A party may terminate without cause on the notice period specified in the agreement, commonly 30 to 90 days. Immediate termination (without notice) is permitted where there has been a material breach, insolvency of the other party, or persistent failure to meet agreed service levels. If the client terminates early without cause, they may be liable for an early termination fee — often equivalent to the remaining fees for the notice period or a percentage of the remaining contract term. The parties may also agree on step-in rights allowing the client to engage a third-party contractor at the defaulting contractor's cost during the cure period.

### What insurance should a maintenance contractor carry in Kenya?

A maintenance contractor in Kenya should maintain at least the following insurance covers. Public liability insurance to cover injury to persons and damage to third-party property arising from maintenance works — the Kenyan insurance market offers policies underwritten by insurers licensed by the Insurance Regulatory Authority under the Insurance Act Cap. 487. Employer's liability insurance or Workers Injury Benefits Act (WIBA) cover for workers engaged in maintenance activities, as required by the Work Injury Benefits Act No. 13 of 2007. Contractor's all-risks insurance for maintenance projects involving significant plant, equipment, or structural works. Professional indemnity insurance where the maintenance contractor also provides design or engineering consultancy services. The maintenance agreement should require the contractor to produce certificates of insurance on request and to add the client as an additional insured on the public liability policy.

### How are disputes under a maintenance agreement resolved in Kenya?

A maintenance agreement should include a tiered dispute resolution clause. The first tier typically requires the parties to attempt resolution by negotiation between senior representatives within 14 days of a dispute arising. If negotiation fails, the parties may refer the dispute to mediation under the Civil Procedure (Court-Annexed Mediation) Rules, 2022 or the mediation rules of the Nairobi Centre for International Arbitration. If mediation does not resolve the dispute within 30 days, either party may refer the matter to arbitration under the Arbitration Act No. 4 of 1995 or to the courts of Kenya. For small claims arising from maintenance agreements, the Small Claims Court Act No. 2 of 2016 provides a cost-effective forum for disputes involving amounts up to KES 1 million.

Fillable version (PDF or Word): [Download the free template](https://forms-legal.com/kenya/business/services/ke-maintenance-agreement)

General information, not legal advice — see our [accuracy & editorial policy](https://forms-legal.com/accuracy-policy). Confirm the cited law is current before relying on it.